Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Raleigh, North Carolina. Working plans call for the construction of a 51,500-square-foot laboratory facility; for site work for a laboratory facility; 6,000-square-foot warehouse / distribution facility; warehouse / distribution facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.
The scope of this project is to Construct a new laboratory/office/seed processing building and Headhouse/Greenhouse facilities to support several of the field-focused research programs. This project will be developed on property leased by the USDA ARS on the grounds of the NCSU campus. The site is estimated at 12.5 acres. Site improvements include parking lot, roads, utilities to within 5' of buildings. Laboratory, office, seed processing building is 45,000 square feet. Greenhouses and headhouses are 6,500 square feet total for two facilities. Optional Equipment storage and shop building are 6,000 square feet. The research and processing structure is to be pre-engineered metal building construction with steel frame and box corrugated metal cladding over insulated girts and perlins. Standing seam metal panel will be the dominant roof material. The support spaces - well house, headhouse, and pump house - will be CMU construction with a CMU veneer and a low slope PVC roof. The building massing reflects the agrarian context of Lake Wheeler Road's research, university, and private residential buildings. The program is deliberately organized to group related functions for efficient process flow and provide office separation from noisier processing areas. The processing areas are designed to allow the plant material to flow from the dirtier delivery eastern side toward the clean processing rooms on the west. The organization of the massing also helps visually screen views of site activities from Lake Wheeler Road and Inwood Road. The main building will be a single story with processing program and office/research spaces organized in wings corresponding to their respective crop. Entry for guests, personnel and research staff will be at the personnel hub in the shortest wing accessed from the parking area to the east. Loading for seed processing areas will be on the eastern end of their respective wings. HVAC, Telecom, Plumbing and Fire Protection systems will run overhead through the breezeway plenum and connect to the wings they service, routed through the roof space of each wing. The headhouse will include a grow room; and an evaporative cooled greenhouse divided into three compartments will be located to the south of the headhouse connected with a covered breezeway. As of February 15, 2024, the design firm has been selected. The construction document completion timeline is scheduled for March 2024. However, the firm timeline has not been released. A tentative bid schedule for contractors has not been disclosed. Further details regarding firm construction and completion timelines have not been identified.
Final Planning
Laboratories
$25,000,000.00
Public - Federal
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 28, 2024
To Be Determined, Raleigh, NC
Related To This Project
Raleigh, NC
Bid Date: Feb 06 2023
Raleigh, NC
Bid Date: Feb 28 2023
Raleigh, NC
Bid Date: Mar 21 2023
Raleigh, NC
Bid Date: May 03 2021
Raleigh, NC
Bid Date: Feb 14 2023
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
Bid Date: Feb 21 2023
Raleigh, NC
Bid Date: Mar 23 2023
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
Bid Date: Aug 15 2023
Raleigh, NC
--
Raleigh, NC
Bid Date: Feb 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.