BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Clearwater, Florida. Contact the soliciting agency for additional information.

contactor Shall: ofurnish the Necessary Labor, Code Compliant Materials, and Transportation to Perform Thefollowing Elevator Preventative Maintenance. operform Preventative Maintenance Service and Code Mandated Safety/mechanical Inspectionsand Test Specified Equipment and Replace Worn Out and/or Defective Parts. oadjust Equipment for Proper Operation. oexamine, Lubricate, Adjust, and Repair/replace Basic Components Listed Below.oselector Motors. obrake Pads, Lining, Disks, and Shores. omagnet Coils. obrushes and Commutators. ocontroller Components, Resistors, Timers, Fuses, Overloads, Minor Contacts, Wiring, Coils. ofunctional Components of Car and Corridor Operating Station. ohangers and Tracks. odoor Operating Devices, Gibs, Guide Shoes, Rollers, Traveling Cables, Signal Lamps.interlocks, Door Closers, Buffers, Overspeed Governors. ocar and Counterweight Safeties. oalarm Bells, Switches, and Door Protection Devices. oexamine, Lubricate, Adjust, and Repair/replace Major Components Listed Below.ohoist Motors, Hoist Ropes, Hoist Machine, Machine and Sheave Bearings, Machinebrake. omotor Generators. opc Boards. osheave and Sheave Assemblies, Solid State Devices. ocompensation Ropes and Chains. ocontactors. ocontractor Shall Periodically Clean the Machine Room, Car Top and Pit of Debris. ocontractor Shall Paint the Machine Room Yearly. ocontractor Shall Perform the Following Equipment Tests for Safety:ogeared Test. ono Load and Full Load Test. oannual Frequency Test. o5 Year Frequency Test. oservice Shall Include 24 Hour Emergency Callbacks. Request for Service Will Be Considered Anemergency if It is to Correct a Malfunction or Adjust the Equipment and Requires Immediate Attentioneither Due to Passenger Entrapment, Loss of Access to a Floor, or Complete Loss of Elevator Service. Anemergency Call Will Necessitate an Elevator Mechanic Be on Site Within 2 Hours of Receiving Initial Call. othese Callbacks Will Not Incur Any Costs as This Term Does Not Include Any Correction Adjustment Thatrequires More Than One Technician or More Than Two Hours to Complete. oemergency Callbacks That Require More Than One Technician and More Than Two Hours to Complete Willincur a Cost of: ocontractor Shall Provide All Labor and Code Complaint Material to Complete the Scope. oresponse to Callbacks During Regular Working Hours Shall Be Within an Average of 4 Hours Ofnotification. oservice Shall Be Performed During Regular Operating Hours (8 Am-5 Pm) Monday-friday Withexception of Holidays, Unless It is an Emergency. ocontractor Shall Haul Away All Material From Jobsite. ocontractor Shall Not Subcontract Work Unless It is a Major Component Needing a Qualified Supplier. orequired Permits Will Be Provided by the Contractor ocontractor Shall Provide Warranty on Parts and Labor. Q/A Cutoff Date: 06/08/2023 Q/A Cutoff Time: 05:00 PM EDT

Post-Bid

Residential Subdivision

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
41
Bidding Soon
800
All Active Projects
317
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 14, 2023

img_map_placeholder

Multiple Locations, Clearwater, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.