Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Eureka, California. Working plans call for the renovation of a educational facility; and power facility.
Pine Hill Elementary School is located at 5230 Vance Ave in Eureka, CA. A site image with potential installation layout is provided in the image below. Bidders should plan to install on the recently re-roofed buildings at Pine Hill Elementary. The new roof is a membrane roof which appears white in the image. the District requests that the PV system installation occur during Summer Break, or during an alternate break, e.g., Thanksgiving, Winter Break. This procurement for design build services is authorized as an energy service contract pursuant to Government Code section 4217.12. P This solicitation seeks proposals for a Photovoltaic (PV) system to be located on property owned by the District at 5230 Vance Ave., Eureka. The expected work product will be to design and implement a photovoltaic solar system that has a first-year production value of no less than 90,050 kWh, which complies with Division of the State Architect (DSA) requirements and California Energy Commission (CEC) guidelines for use of Energy Conservation Assistance Act-Education Subaccount (ECAA-Ed) funding. Utility data can be provided by the Project Manager upon request. However, proposers should also consider alternate locations on other District buildings and/or ground-mounted arrays on District property. Total allocated Energy Conservation Assistance Act (ECAA) funding available to the District for this project, including permitting and design, is $246,400.00. The District has installed a new roof on most of the buildings at Pine Hill Elementary and would like proposals for a roof-mounted array on the re-roofed buildings. The selected ESCO will work with the District to determine the best installation option/location(s), taking into account initial installation costs, long-term maintenance and operational costs, technical feasibility, permitting restrictions, aesthetics, customer preferences and future facility upgrades. This procurement for design build services is authorized as an energy service contract pursuant to Government Code section 4217.12. Prior to the potential award of a contract to the selected ESCO, District Board of Directors will adopt a resolution as required by Government Code section 4217.12, finding that the anticipated cost to the District for electrical power generation to be provided by the proposed solar power project will be less than the anticipated marginal cost to the District of electrical energy that would have been consumed by the District in the absence of this project. The contract with the selected ESCO will be the sole contract the District will hold for the completion of this project. The site visit and forum are designed to increase the likelihood that respondents have the applicable and appropriate information necessary to deliver proposed solutions that meet the district's expressed needs. The scope of services provided by the selected ESCO shall include all tasks required to design, fabricate, store, deliver, install, and commission a fully operational PV system for the District. Any required ancillary equipment, such as security fencing for a ground-mounted installation, or access ladders for roof-mounted panels, are included in the scope of work. The scope shall also include, but not be limited to, securing all permits and approvals from governing agencies (including DSA and the City of Eureka, all labor, taxes, services, permit fees, training, and equipment necessary to produce a fully operational solar PV system. The selected ESCO will be expected to work with the District to design/engineer the solar PV system to meet the District's specific design and funding criteria, and to maximize the solar energy resources, taking into consideration the District's electrical demand and load patterns, proposed installation site, available solar resources, existing site conditions, proposed future site improvements, and other relevant factors. In addition, the selected ESCO will be expected to complete installation and integration of the system based on a schedule as dictated by the District's funding sources for this project. Construction Complete September 15, 2023. 1). This Article includes requirements for the diversion by the ESCO of construction and demolition debris from landfills. The ESCO shall develop and implement a Waste Management Plan as specified herein. The ESCO shall take a pro-active, responsible role in the management of construction and demolition waste and require all Subcontractors, vendors, and suppliers to participate in the effort. 2). The District has established that this Project shall generate the least amount of waste practicable and that processes shall be utilized that ensure the generation of as little waste as possible due to over-packaging, error, poor planning, breakage, mishandling, contamination, or other factors. 3). As much of the waste materials as economically feasible shall be reused, salvaged, or recycled. Waste disposal in landfills shall be minimized. 4). The ESCO is encouraged to use waste hauling companies that separate recyclable materials. The ESCO shall work with its waste haulers in providing other recycling methods as appropriate. 5). The ESCO is responsible for implementation of any special programs involving rebates or similar incentives related to the recycling of waste. Revenues or other savings obtained for salvage or recycling accrue to the ESCO. 1. Base Bid: Design, Procure, Install, Test, and Commission a Grid-tied Solar PV System. a. Provide all design, labor, and materials for a turnkey, code compliant installation of a 70 kw (DC) grid tied solar photovoltaic array, or similar sized array, capable of producing 90,050 kWh/year. Bidders should propose the largest array size possible while staying within the allocated budget. b. The system shall be designed to take advantage of PG&E's Net Energy Metering program. c. PV array should be installed on the south facing roofs with an area of approximately 4,000-6,000 square feet. As of February 2, 2023, the due date and time has been confirmed with the owner.
Final Planning
Solar Power Generation
$246,400.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2023
March 23, 2023
5230 Vance Ave, Eureka, CA
Related To This Project
Eureka, CA
Bid Date: Feb 21 2023
Eureka, CA
Bid Date: Mar 14 2023
Eureka, CA
--
Eureka, CA
--
Eureka, CA
Bid Date: Apr 11 2023
Eureka, CA
Bid Date: Mar 31 2023
Eureka, CA
Bid Date: Apr 18 2023
Eureka, CA
Bid Date: Feb 23 2023
Eureka, CA
Bid Date: Jan 26 2023
Eureka, CA
Bid Date: Jan 26 2023
Eureka, CA
Bid Date: Jan 25 2023
Eureka, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.