Demolition and site work for a mixed-use development in New Braunfels, Texas. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

**As of May 30, 2023, project was awarded to J.R. Ramon & Sons, Inc.,., but awarded amount is not available** RFP #23-02 Demolition of NBISD School Building The New Braunfels Independent School District is requesting proposals to provide NBISD School District Building Demolition for the Carl Schulz Building E. Legal Description on Comal Appraisal District site is: CITY BLOCK 4059, LOT 10-11-12-13, CITY BLOCK 4060, LOT A & B Direct question to Lydia Seigal, Purchasing/Contracting Specialist New Braunfels Independent School District 1000 N. Walnut New Braunfels, Texas 78130 Phone: 830-643-5727 Email: lydiaseigal@nbisd.org Contractor shall provide all labor, material, equipment and supervision to complete the Work including but not necessarily limited to the following: 1. Provide site utility investigation drawings to the district prior to commencing of work. 2. Provide layout as required for demolition operations. 3. Provide all special engineering, shorting, scaffolding and/or equipment required for demolition operations. 4. Any salvage items will be listed and removed by the District prior to demolition work. 5. Contractorshall be responsible for removal and disposal of all items under, above, and within project limits. 6. All waste material shall become the property of the contract and shall be his/her sole responsibility to dispose of this material off the limits of the site to a state licensed landfill. Contractor will be required to provide documentation where disposed material is taken. Owner will not be responsible for waste material. 7. Contractor agrees that they shall assume sole responsibility for the job site conditions during demolition of the project, including safety of all persons and property. 8. Prior to building demolition, the contractorshall demolish, remove,salvage and make safe all electrical wiring. 9. Contractor is required to have a competent foreman on site every day and provide written documentation of review of safety for the days of operation. 10. Provide adequate manpower and/or overtime to meet construction schedule. 11. Contractor to provide dumpster for theirscope of work and haul off all demolished materials. 12. Provide multiple mobilizations as required to complete scope of work as directed. 13. Protect all trees during demolition of building. 14. Obtain all permits as required. 15. Cap all plumbing and sewer 16. Providing fencing 100% around site during demolition

Award

Educational

$60,000.00

Public - City

Demolition, Site Work

8

4

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
29
Bidding Soon
2,336
All Active Projects
910
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.