Site work for a civil project in Lisbon, Iowa. Completed plans call for site work for a water / sewer project.
Work on the improvement shall commence within ten days of the issuance of a written Notice to Proceed. The Notice to Proceed will be issued upon approval of the contract by the City Council, and be completed as stated below. The Work will include but is not limited to the following improvements: WELL 5 IMPROVEMENTS Construct Silurian Well 5 including all materials, labor and equipment necessary to construct well including mobilization, Well Water Pollution Prevention Plan, 23" drill hole, 18" drill hole, 11" drill hole, installing 12" steel casing pipe, cement grouting, bentonite sealing, well development and test pumping; acidizing, disinfection, water quality testing; excavation, backfill, and sitework; seeding and miscellaneous associated work including cleanup. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of five percent (5%) of the bid. The bid security should be made payable to the CITY OF LISBON, IOWA. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the City as liquidated damages in the event the successful bidder fails or refuses to enter into a contract within ten (10) days after the award of contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and the maintenance of said work, pursuant to the provisions of this notice and the other contract documents. Bidders shall use the bid bond form included in the specifications. No bidder may withdraw a proposal within forty-five (45) days after the date set for opening bids. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by the City of Lisbon and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Lisbon from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. All Contractor(s) and subcontractor(s) are required to obtain tax exemption certificates from the City of Lisbon for this project. These tax exemption certificates are only for use on this specific project as covered under the Contract. Work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed. All work shall be completed, subject to any extensions of time, by August 4, 2023. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each calendar day that work remains uncompleted after August 4, 2023, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Payment of the cost of said project will be made from any one or a combination of the following sources at the sole discretion of the City Council: (1) cash to be derived from the proceeds of the issuance and sale of Water Revenue Bonds, which will be payable solely and only out of the future net revenues of the Municipal Water Utility, and/or from such other cash funds on hand of said Utility as may be lawfully used for said purpose; (2) cash derived from the proceeds of the issuance and sale of General Obligation Bonds of said City; and (3) cash from such general funds of said City as may be legally used for such purpose. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and payments made to material suppliers for materials ordered specifically for the project or delivered to the site during the preceding calendar month. Estimates will be prepared on the last day of each month by the Contractor, subject to the approval of the Engineer, who will certify to the City for payment each approved estimate on or before the tenth (10th) day of the following month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Upon completion of the work and its acceptance by the Council, the Contractor will be paid an amount which, together with previous payments, will equal ninety five percent (95%) of the contract price of the contract. Final payment of the remaining five percent (5%) will be made not less than thirty-one (31) days after completion and acceptance by resolution of the City Council of the completed contract, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa, as amended. No such partial or final payments will be due until the Contractor has certified to the City that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. In accordance with the requirements of the Iowa Department of Labor all bidders must submit a fully completed Bidder Status Form. The Bidder Status Form must be included with and is considered an essential attachment to the Proposal. Any Proposal that does not include a fully completed Bidder Status Form may result in the Proposal being determined non-responsive and rejected. If it is determined that adherence to these Iowa statutory requirements may cause denial of federal funds which would otherwise be available for a public improvement, or would otherwise be inconsistent with requirements of any federal law or regulation, the application of Iowa Code Chapters 73 and 73A shall be suspended to the extent necessary to prevent denial of the funds or to eliminate the inconsistency with federal requirements. The City of Lisbon reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.
Post-Bid
Water / Sewer
$20,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2023
March 13, 2023
To Be Determined, Lisbon, IA
Related To This Project
Lisbon, IA
Bid Date: Jun 13 2023
Lisbon, IA
Bid Date: Oct 09 2023
Lisbon, IA
Bid Date: Jan 12 2022
Lisbon, IA
Bid Date: Feb 23 2022
Lisbon, IA
Bid Date: Oct 07 2021
Lisbon, IA
Bid Date: Aug 05 2021
Lisbon, IA
Bid Date: May 30 2024
Lisbon, IA
--
Lisbon, IA
Bid Date: Feb 09 2023
Lisbon, IA
Bid Date: May 05 2022
Fayette, IA
Bid Date: Feb 16 2023
West Des Moines, IA
Bid Date: Mar 02 2023
Des Moines, IA
Bid Date: Oct 31 2023
Sioux City, IA
Bid Date: Jun 21 2021
Sioux City, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.