BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Roswell, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of March 31, 2023. The project has been awarded with the amount of $4,173,896.50. The City of Roswell is seeking GDOT Prequalified Contractors for Work Class: 400 - HOT MIX ASPHALTIC CONCRETE CONSTRUCTION and Work Class: 432 - MILL ASPHALT PAVEMENT. The project consists of resurfacing a total of 38 roads within the city of Roswell with a total area of 196,795 square yards of asphalt pavement and total length of 11.54 center line miles. Ninety (90) calendar days have been set aside for performance of the contract. The bid is a firm fixed price to complete the work based on the submitting contractor's understanding of the scope and assessment of the sites with a payment term of Net 30 days. A Bid Bond in the amount of 5% is required. Payment and Performance bonds equal to 100% of the Awarded Contract value are required. The City of Roswell has the right to reject any or all bids; to award a contract in the best interest of the City and to waive technicalities and informalities. Any pre-bid conference for the Project, and its status as a mandatory or non-mandatory event, will be provided on, and held in accordance with the Project Schedule posted on the designated website - if posted as an event. Bids will not be accepted from Bidders that do not attend mandatory pre-bid conferences. REQUIREMENTS: 1. Milling of the top 1 1/2 " of the existing surface 2. Patching distress areas as directed by city of Roswell inspectors with 440 LB/SY/IN 25mm Recycled asphalt concrete 3. Resurfacing with 165 LB/SY/IN 9.5mm Recycled Asphalt Concrete (20% maximum RAP) 4. Re-striping as existing or per city of Roswell inspector directions 5. Restoration of damaged traffic loops within seven days of milling OTHER REQUIREMENTS AND RESTRICTIONS: 1. Open Graded Interlayer (OGI) may be required on some roads as directed by city of Roswell inspectors 2. Maximum time between milling and resurfacing not to exceed 72 hours 3. Work hours are Monday through Saturday from 7:00 AM until 4:00 PM 4. No lane closures are allowed before 9:00 AM or after 4:00 PM 5. Traffic control to be included in unit prices 6. Line item codes reference GDOT specifications

Award

Roads / Highways

$4,173,897.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
55
Bidding Soon
1,539
All Active Projects
573
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.