Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Pasadena, Maryland. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of May 24, 2023, the project has not been awarded. The project is expected to be awarded by July, 2023. For Rehabilitation of Bridge No. AA-3001 Magothy Bridge Road over Magothy River Solicitation :CAP23000184 The Work includes the following major items: (a) Removal of existing superstructure, including existing girders, in three stages in order to accommodate MOT. (b) Removal of existing bearings and bearing pedestals at all piers and abutments. (c) Removal of all four existing wing walls. (d) Widening of both abutments and both piersto the north and south. There will be new steel pipe piles driven at both abutments and both piers to support the widening. (e) Construction of four new wing walls. (f) Construction of a steel beam superstructure with a reinforced concrete deck, sidewalk, parapets, and chainlink fences. New bearing pads and bearings will be placed to accommodate new location of beams. (g) Removal of existing 16 inch water line and placement of new 16 inch water line. (h) Removal of steel jackets on existing piers and replacement with full height fiberglass jackets. (i) Construction of roadway embankments,superpave asphalt approach roadways,sidewalks, curbs and gutters, F-Shape barrier, pavement markings, etc. (j) Construction of roadside ditches, inlets, pipes, manholes and outfalls for stormwater collection and conveyance. (k) Construction of a sand filter to accomodate stormwater management. (l) Installation of metal traffic barriers complete with end treatments and anchorages to the structure. (m) Install new weather sensors in bridge deck and in roadway. The cost range for the Project is: $2,500,000 to $5,000,000. Questions regarding this Project should be directed to the PROJECT MANAGER, Debra Russell, at 410-222-1340. Questions due from contractors by February 23rd at 5:00 PM local time.
Bid Results
Bridges / Tunnels
$5,280,494.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2023
June 26, 2023
Magothy Bridge Rd, Pasadena, MD
Related To This Project
Pasadena, MD
Bid Date: Jul 20 2023
Pasadena, MD
Bid Date: Jun 21 2023
Pasadena, MD
--
Pasadena, MD
Bid Date: Feb 25 2020
Pasadena, MD
Bid Date: Jan 18 2022
Pasadena, MD
Bid Date: Jan 20 2022
Pasadena, MD
Bid Date: Feb 14 2019
Pasadena, MD
Bid Date: Jul 31 2018
Pasadena, MD
Bid Date: May 14 2019
Pasadena, MD
Bid Date: Aug 22 2018
Pasadena, MD
Bid Date: Apr 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.