BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Maryville, Missouri. Completed plans call for the renovation of a educational facility.

The project includes Northwest Missouri State University will be renovating the HVAC System at Wells Hall. There are 2 main AHUs (approx.80 and 50TR) operating on remote air-cooled condensing units. This project undertakes to remove the DX coils from AHUs and replace them with chilled water coils to match the existing Carrier AHUs. Chilled water shall be piped from existing campus loop that is routed through the basement of Wells Hall. Demo of the condensing units shall be performed under an alternate bid. Demo of existing DX coils and condensing units shall occur at the conclusion of Spring 2023 semester. In other words, both AHUs should remain operational until the end of Spring 2023 semester. Project scope also includes providing new ductless split units at 5 locations in the building. Installation of the ductless split units could be done any time after contract is issued. Notice to Proceed / Mobilization - 3/23/2023 Substantial Completion - 7/14/2023 Northwest Missouri State University will be renovating the HVAC System at Wells Hall. There are 2 main AHUs (approx.80 and 50TR) operating on remote air-cooled condensing units. This project undertakes to remove the DX coils from AHUs and replace them with chilled water coils to match the existing Carrier AHUs. Chilled water shall be piped from existing campus loop that is routed through the basement of Wells Hall. Demo of the condensing units shall be performed under an alternate bid. Demo of existing DX coils and condensing units shall occur at the conclusion of Spring 2023 semester. In other words, both AHUs should remain operational until the end of Spring 2023 semester. Project scope also includes providing new ductless split units at 5 locations in the building. Installation of the ductless split units could be done any time after contract is issued. Existing BAS at Wells Hall shall be used for this upgrade project.

Award

Educational

$206,378.00

Public - State/Provincial

Renovation

14

14

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
32
Bidding Soon
530
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

March 24, 2023

img_map_placeholder

800 University Dr, Maryville, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.