Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a laboratory facility in Batavia, Illinois. Completed plans call for the renovation of a laboratory facility.
Fermilab is requesting a proposal for removal and replacement of one roofing systems at one existing buildings. To All Prospective Offerors, Fermi Research Alliance, LLC (FRA) is seeking a contractor for MINOS Roofing Replacement at Fermi National Accelerator Laboratory located in Batavia, IL. This acquisition is being advertised as a 100% small business set-aside and as a lowest price technically acceptable procurement. The NAICS Code for this procurement is 238160 Roofing Contractors. . FRA REQUIRES ALL SUBCONTRACTOR EMPLOYEES AND SUB-TIER SUBCONTRACTORS COMING ON TO THE FERMILAB AND SOUTH DAKOTA DEPARTMENT OF ENERGY LEASED SITES TO COMPLY WITH REAL-ID REQUIREMENTS. FOR MORE INFORMATION PLEASE GO TO https://eshq.fnal.gov/realid/ Offerors are requested to submit questions relative to the RFP and should be submitted via email to gdutollo@fnal.gov. All questions shall be submitted in writing no later than February 9, 2023. JOB SITE ES&H INSPECTIONS/MEETINGS After the start of work and throughout the entire work period, the Subcontractor shall monitor and inspect the work area and operations for compliance with the Subcontractor's accepted ES&H Program, Hazard Analysis, and/or CESH Certification on a daily basis. The Subcontractor's Project Team is expected to conduct these inspections and correct any deficiencies found. These inspections shall be documented by the Subcontractor and maintained on-site for the duration of the project. Records shall be available for review upon request by FRA. The following requirements concern Job Site ES&H meetings: Daily Work Planning Meetings in the form of daily briefings shall be conducted by the Subcontractor Field Superintendent and attended by all sub tier contractors on site that day. The daily planning meeting will discuss the planned work activities, review the applicable hazard analysis, and allow for employee questions and feedback regarding the work activity documented on form found on Attachment B; Weekly Toolbox Meetings of approximately five (5) minutes duration shall be conducted at the job site by the various area/job foreman or superintendents for their specific crafts. These meetings shall emphasize the current construction operations and provide an opportunity for inspection of tools and personal protective equipment. The Subcontractor will document the daily and weekly toolbox meetings (date, topic, attendance, etc.) and provide a copy to FRA. The FRA Construction Coordinator will be notified of all job site ES&H meetings and may attend. Work will include: Furnish all labor, materials, and equipment required to remove and dispose of existing roofing and insulation down to bare decking. Replace with new SBS Asphalt 4CID CR G roofing system, including miscellaneous associated work as described in the drawing set "MINOS (785) Roofing Replacement," FESS Project No. 3-12-02E, dated September 19,2022. Provide all associated work including but not limited to relocation and reinstallation of existing roof equipment, removal and replacement of all roofing trim, facia, gravel stops, and coping. Furnish all engineering, labor, materials, and equipment required for new fall arrest system anchor tie to be provided by delegated design.
Post-Bid
Laboratories
$400,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2023
March 31, 2023
Kirk & Pine St, Batavia, IL
Related To This Project
Batavia, IL
Bid Date: Feb 15 2023
Batavia, IL
Bid Date: Mar 04 2024
Batavia, IL
Bid Date: Mar 03 2023
Batavia, IL
Bid Date: Feb 22 2023
Batavia, IL
Bid Date: Feb 17 2023
Batavia, IL
Bid Date: Mar 02 2023
Batavia, IL
Bid Date: Mar 21 2023
Batavia, IL
Bid Date: Mar 10 2023
Batavia, IL
Bid Date: Feb 03 2023
Batavia, IL
Bid Date: Jan 24 2023
Batavia, IL
--
Batavia, IL
Bid Date: Oct 04 2022
Batavia, IL
Bid Date: May 22 2019
Batavia, IL
Bid Date: Aug 11 2022
Batavia, IL
Bid Date: Apr 19 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.