Demolition, site work, new construction, renovation and addition to an educational facility in Riverside, New Jersey. Completed plans call for the addition of a educational facility; for site work for a educational facility; for the demolition of a one-story above grade educational facility; for the construction of a 16,000-square-foot, two-story above grade educational facility; and for the renovation of a educational facility.
The Project includes demolition of the existing 1-story Board Office, adjacent playground area and related site work in preparation for the new construction. The demolition work also includes the removal of Category I non-friable asbestos-containing roofing materials on the Board of Education Building Section (See the Asbestos Abatement Specification by for the Specific Scope of Work). This phase shall be completed on or before August 18, 2023. Question Deadline May 16, 2023 at 5:00 PM Construction of a 2-story approximately 16,000 SF load bearing masonry and steel building housing ten (10) classrooms with toilet rooms, small group instruction room, Board Offices and a staircase. Renovation of existing nurse's suite and adjacent areas to the construction. Renovation of existing nurse's suite and adjacent areas to the construction. This work cannot commence until the Summer of 2024. No work On Site can be started until all permits are received. The existing school must be completely operational during the school year. The overall project completion date is November 29, 2024. Milestone Schedule: Phase 1 Completion is August 18, 2023: Demolition and Site Preparation. Phase 2 June 17, 2024 - August 8, 2024: Renovation of the existing nurse's suite, corridor bathroom renovation and boiler, hot water heating system and domestic hot water heating system. All construction preparation work, project startup, submittals, schedules, approvals, procurement, coordination and other preparatory tasks must commence immediately upon receipt of the Notice to Proceed or the date of the fully executed Owner/Contractor Contract, whichever comes first. The Awarded Contractor must be fully prepared to deliver and install all materials and equipment on the first day of the scheduled On-Site Construction period. The Project includes demolition of the existing 1-story Board Office, adjacent playground area and related site work in preparation for the new construction. The demolition work also includes the removal of Category I non-friable asbestos-containing roofing materials on the Board of Education Building Section (See the Asbestos Abatement Specification by TTI Environmental, Inc. for the Specific Scope of Work). This phase shall be completed on or before August 18, 2023. b. Construction of a 2-story approximately 16,000 SF load bearing masonry and steel building housing ten (10) classrooms with toilet rooms, small group instruction room, Board Offices and a staircase. c. Renovation of existing nurse's suite and adjacent areas to the construction. This work cannot commence until the Summer of 2024. d. Replacement of existing boilers, hot water heating system, and domestic hot water heating system in the existing building. This work cannot commence until the Summer of 2024. e. New playground and soft and hard surface recreation area. f. New stormwater piping of the construction area and the new addition including replacement of the stormwater main on Grant Street to the corner of Park Avenue. g. Coordinate with work not in this scope provided by the Owner's vendors including, but not limited to: Access Control, Security/Cameras, AI Phone, Telephone Systems, Clocks, campus roofing replacement work in the Summer of 2024, window (Kalwall) replacement in the Summer of 2023. Provide associated work with these systems as shown on the responsibility schedule on the electrical drawings. SCOPE OF WORK Page - 2 B. No work On Site can be started until all permits are received. The existing school must be completely operational during the school year. The overall project completion date is November 29, 2024. Milestone Schedule: Phase 1 Completion is August 18, 2023: Demolition and Site Preparation. Phase 2 June 17, 2024 - August 8, 2024: Renovation of the existing nurse's suite, corridor bathroom renovation and boiler, hot water heating system and domestic hot water heating system. C. All construction preparation work, project startup, submittals, schedules, approvals, procurement, coordination and other preparatory tasks must commence immediately upon receipt of the Notice to Proceed or the date of the fully executed Owner/Contractor Contract, whichever comes first. The Awarded Contractor must be fully prepared to deliver and install all materials and equipment on the first day of the scheduled On-Site Construction period. D. The Work will be constructed under one lump sum prime contract
Award
Educational
$6,526,000.00
Public - City
Addition, Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 31, 2023
July 31, 2023
112 E Washington St, Riverside, NJ
Related To This Project
Riverside, NJ
Bid Date: Feb 24 2023
Riverside, NJ
Bid Date: Mar 16 2023
Riverside, NJ
Bid Date: Mar 22 2023
Riverside, NJ
Bid Date: Mar 30 2023
Riverside, NJ
Bid Date: May 11 2023
Riverside, NJ
Bid Date: May 31 2023
Riverside, NJ
Bid Date: Aug 31 2023
Riverside, NJ
Bid Date: Dec 14 2021
Riverside, NJ
Bid Date: Sep 08 2022
Riverside, NJ
Bid Date: Jun 16 2021
Riverside, NJ
Bid Date: Oct 15 2020
Riverside, NJ
Bid Date: Dec 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.