BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, renovation and addition to an educational facility in Riverside, New Jersey. Completed plans call for the addition of a educational facility; for site work for a educational facility; for the demolition of a one-story above grade educational facility; for the construction of a 16,000-square-foot, two-story above grade educational facility; and for the renovation of a educational facility.

The Project includes demolition of the existing 1-story Board Office, adjacent playground area and related site work in preparation for the new construction. The demolition work also includes the removal of Category I non-friable asbestos-containing roofing materials on the Board of Education Building Section (See the Asbestos Abatement Specification by for the Specific Scope of Work). This phase shall be completed on or before August 18, 2023. Question Deadline May 16, 2023 at 5:00 PM Construction of a 2-story approximately 16,000 SF load bearing masonry and steel building housing ten (10) classrooms with toilet rooms, small group instruction room, Board Offices and a staircase. Renovation of existing nurse's suite and adjacent areas to the construction. Renovation of existing nurse's suite and adjacent areas to the construction. This work cannot commence until the Summer of 2024. No work On Site can be started until all permits are received. The existing school must be completely operational during the school year. The overall project completion date is November 29, 2024. Milestone Schedule: Phase 1 Completion is August 18, 2023: Demolition and Site Preparation. Phase 2 June 17, 2024 - August 8, 2024: Renovation of the existing nurse's suite, corridor bathroom renovation and boiler, hot water heating system and domestic hot water heating system. All construction preparation work, project startup, submittals, schedules, approvals, procurement, coordination and other preparatory tasks must commence immediately upon receipt of the Notice to Proceed or the date of the fully executed Owner/Contractor Contract, whichever comes first. The Awarded Contractor must be fully prepared to deliver and install all materials and equipment on the first day of the scheduled On-Site Construction period. The Project includes demolition of the existing 1-story Board Office, adjacent playground area and related site work in preparation for the new construction. The demolition work also includes the removal of Category I non-friable asbestos-containing roofing materials on the Board of Education Building Section (See the Asbestos Abatement Specification by TTI Environmental, Inc. for the Specific Scope of Work). This phase shall be completed on or before August 18, 2023. b. Construction of a 2-story approximately 16,000 SF load bearing masonry and steel building housing ten (10) classrooms with toilet rooms, small group instruction room, Board Offices and a staircase. c. Renovation of existing nurse's suite and adjacent areas to the construction. This work cannot commence until the Summer of 2024. d. Replacement of existing boilers, hot water heating system, and domestic hot water heating system in the existing building. This work cannot commence until the Summer of 2024. e. New playground and soft and hard surface recreation area. f. New stormwater piping of the construction area and the new addition including replacement of the stormwater main on Grant Street to the corner of Park Avenue. g. Coordinate with work not in this scope provided by the Owner's vendors including, but not limited to: Access Control, Security/Cameras, AI Phone, Telephone Systems, Clocks, campus roofing replacement work in the Summer of 2024, window (Kalwall) replacement in the Summer of 2023. Provide associated work with these systems as shown on the responsibility schedule on the electrical drawings. SCOPE OF WORK Page - 2 B. No work On Site can be started until all permits are received. The existing school must be completely operational during the school year. The overall project completion date is November 29, 2024. Milestone Schedule: Phase 1 Completion is August 18, 2023: Demolition and Site Preparation. Phase 2 June 17, 2024 - August 8, 2024: Renovation of the existing nurse's suite, corridor bathroom renovation and boiler, hot water heating system and domestic hot water heating system. C. All construction preparation work, project startup, submittals, schedules, approvals, procurement, coordination and other preparatory tasks must commence immediately upon receipt of the Notice to Proceed or the date of the fully executed Owner/Contractor Contract, whichever comes first. The Awarded Contractor must be fully prepared to deliver and install all materials and equipment on the first day of the scheduled On-Site Construction period. D. The Work will be constructed under one lump sum prime contract

Award

Educational

$6,526,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
200
Bidding Soon
3,890
All Active Projects
1,787
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

July 31, 2023

img_map_placeholder

112 E Washington St, Riverside, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.