Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Hickory, North Carolina. Completed plans call for site work for a bridge / tunnel; and water / sewer project.
Submit Written Questions Contractor February 6, 2023 at 5:00 PM Provide Responses to Questions County February 8, 2023 at 5:00 PM Contract Award County TBA Contract Effective Date County Upon Execution Written questions shall be emailed to tinawright@catawbacountync.gov ShadowFax Wynd is a road located within the Deerfield subdivision, off of Willowbottom road, in Hickory NC. The road was constructed in or about 2000 and has been privately maintained. The residents have petitioned the County to finance road repairs to bring the neighborhood roads up to North Carolina Department of Transportation (NCDOT) standards with the goal that the road will be accepted into NCDOT's secondary road maintenance program. A pipe culvert is in bad condition and needs to be replaced. The drainage system associated with ShadowFax Wynd Subdivision Road will have to be modified to meet NCDOT standards. There is a large pipe for a creek crossing, located at station 4+40-5+00, that will need to be replaced along with the associated headwalls. The current pipe is approximately 55 feet long and is a 60-inch diameter Corrugated metal pipe. The single pipe will have to be replaced by either two (2) 60-inch diameter pipes (the pipes must be made of NCDOT approved materials), or one (1) 95-inch by 67-inch Corrugated metal pipe arch (or other NCDOT approved material). Dimensions of the headwall at the upstream side is 12 feet deep for a length of 12 feet in the middle and 8 feet to either side the depth is 5 feet. On the downstream side, depth is 14.5 feet for a length of 12 feet, 7 feet further on either side the depth is 7 feet and 7 more feet brings depth to 6 feet. The head and tail walls for the creek crossing must be constructed in accordance with NCDOT approved materials and design details as presented in NCDOT Standard Drawings 300.01 and 838.28. Please see Drawings 300.01, 838.28, 840.72 and 816.01 attached hereto as Attachment B. Existing culvert system will need to be demolished and waste disposed of. Contractor will need to excavate existing pipe culvert and undercut in the creek bed so that the foundation can be properly conditioned. Pipe installation must follow NCDOT guidelines as shown in attachment 300.01. Use suitable excavated material as backfill; or in the formation of embankments, subgrades, and shoulders. The reinforced concrete head and tail walls will need to be constructed in accordance with NCDOT guidelines as shown in attachment 838.28 using Class A concrete. The road will be built back up with soil backfill compacted to 100% of standard proctor and topped with NCDOT Nonwoven Geotextile Type 4 installed below 8 inches of compacted ABC gravel base. The gravel base will have to pass a proof roll. The Contractor will be responsible for providing all tools, equipment and materials to complete the work. Proper traffic control measures and signage will be necessary to control access. Access to all houses and active construction sites will be maintained throughout the duration of the project. The Contractor will need to minimize impact to the stream and have proper erosion and sediment control measures in place and keep them maintained throughout project. The Contractor will be responsible for having the gravel and soil density tests performed by a qualified and certified testing firm and for coordinating with County staff to witness proof rolls. Prior to final acceptance, the inspector will ensure installed pipe has no cracks or deformations.
Award
Bridges / Tunnels
$189,168.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2023
April 3, 2023
Shadowfax Wynd, Hickory, NC
Related To This Project
Hickory, NC
Bid Date: Mar 09 2023
Hickory, NC
Bid Date: Mar 21 2023
Hickory, NC
Bid Date: Mar 21 2023
Hickory, NC
Bid Date: Mar 16 2023
Hickory, NC
Bid Date: Mar 29 2023
Hickory, NC
Bid Date: Apr 17 2023
Hickory, NC
Bid Date: Apr 05 2023
Hickory, NC
Bid Date: Apr 17 2023
Hickory, NC
Bid Date: Feb 09 2023
Hickory, NC
Bid Date: Jan 31 2023
Hickory, NC
Bid Date: Feb 09 2023
Hickory, NC
Bid Date: Apr 30 2019
Hickory, NC
Bid Date: Jan 09 2023
Hickory, NC
Bid Date: Jan 10 2023
Hickory, NC
Bid Date: Jan 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.