Demolition, site work, new construction and addition to an educational facility in Bogart, Georgia. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the construction of a 15,000-square-foot, one-story above grade educational facility; and for site work for a 68,874-square-foot educational facility.

Oconee County Schools is seeking proposals for a 12 classroom addition to Malcom Bridge Elementary School. The new 15,000 s.f. one-story addition to existing Malcom Bridge Elementary School consists of steel frame structure on concrete foundations that will be erected on the Northwest side of existing school building. Work will include, but is not limited to, site work, concrete flat work and site retaining wall, structural steel, exterior masonry, metal and TPO roofing, painting, finishes, metal and wood doors, and hardware installation, toilet partitions, installation of plumbing, fire protection, HVAC, electrical systems and replacement of the existing intercom system. The anticipated date of substantial completion is June 22, 2024. All proposals accepted must be in sealed envelopes marked with your company name and "MALCOM BRIDGE ELEMENTARY SCHOOL ADDITION". Offerors shall provide three (3) hard copies and one (1) digital copy on a flash drive of the entire proposal package. For mailing purposes, please address your proposal to Oconee County School District, 34 School Street, Watkinsville, GA 30677, Attn: Fred Ricketson. For Inquiries Regarding the Proposal Documents: All communications concerning these documents must be submitted in writing to Oconee County School District (OCSD) Operations Division by email to biddocse.lpbatlanta.com. Any Offeror submitting a Proposal must procure a set of the Construction Documents from the office of: Lindsay Pope Brayfield & Assocs., Inc., Architects 344 West Pike Street, Lawrenceville, Georgia 30046 770-963-8989 Contract, if awarded, will be on the basis stated in the Instructions to Offerors (Section 00-21-16). No proposal may be withdrawn for a period of sixty (60) days after proposal opening, except as otherwise expressly provided by the applicable law. Proposals must be accompanied by a bid bond made payable to Oconee County School District, in the amount equal to five percent (5%) of the proposal lump sum contract price (exclusive of Alternates and Unit Prices). The successful Offeror will be required to furnish a Performance Bond and a Payment Bond acceptable to the Oconee County School District in an amount equal to one hundred percent (100%) of the contract price and executed by a Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. The Surety Company shall have an A.M. Best Company minimum rating of "A" with a financial size of VI "6" or better. Bonds must be accompanied by letter stating bonding company's current rating for verification prior to acceptance by the Owner and execution of the formal Owner/Contractor agreement. Additionally, Oconee County School District requests that all responses be submitted in electronic form via flash/thumb drive. PDF format is acceptable unless otherwise stated. Contractor and Subcontractors shall require the Attorney-in-Fact who executes bonds on behalf of sureties to attach a certified, current copy of his Power of Attorney. A Performance Bond and Payment Bond will be required for the following Subcontractors: The Site Work Subcontractor, the Fire Protection Subcontractor, the Electrical Subcontractor, the Plumbing Subcontractor, the Mechanical Contractor and the Roofing Subcontractor. All interested parties are required to attend. Failure to attend the Pre-Proposal Conference shall result in disqualification of the Contractor. Oconee County School District reserves the right to reject any or all proposals and to waive any technicalities and informalities in procedure. All Offerors must provide proof of previous job experience within thirty percent (30%) of the cost of this project. OCSD will consider the submittal and respond within five (5) days if the submittal is not accepted. Contractors

Award

Educational

$4,499,000.00

Public - County

Addition, Demolition, New Construction, Site Work

74

25

43

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Electricity, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Unit Masonry, Clay Unit Masonry, Brick Masonry, Brick Veneer Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Support Assemblies, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Millwork, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Roofing and Siding Panels, Metal Wall Panels, Siding, Flashing and Sheet Metal, Sheet Metal Roofing, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Glazing Accessories, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Exterior Specialties, Protective Covers, Canopies, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Runners, Furniture, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Central HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Structured Cabling
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons, Storm Drainage Utilities, Culverts, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
78
Bidding Soon
1,578
All Active Projects
714
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

May 1, 2023

img_map_placeholder

2600 Malcom Bridge Rd, Bogart, GA

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Malcom Bridge Elementary School Addition

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.