Site work and paving for a sidewalk / parking lot in Kalamazoo, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of March 24, 2023, the project has been awarded. A timeline for construction has not been confirmed. It is the intent of these plans and specifications to provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the 2023 Sidewalk Repair Program as described. Questions for this IFB should be directed to: Department Contact: Tom Palumbo, PE Senior Civil Engineer - Public Works at palumbot@kalamazoocity.org or 269-303-5142 Questions regarding this sealed bid delivery and bid opening policy change related to the COVID-19 virus should be directed to the City of Kalamazoo at (269) 337-8020. Sincerely, Michelle Emig Purchasing Division Manager Questions regarding terms, conditions and other related bid requirements may be addressed to Monica Johnson, Buyer, at johnsonm2@kalamazoocity.org or (269) 337-8603. The scope of work for this project shall consist of removing and replacing sidewalk sections marked for removal on the streets indicated in the bid documents and constructing new sidewalk in the locations as specified in the appendices and drawings attached. Tree and brush trimming shall take place in accordance with this contract to allow for free passage of pedestrians along City sidewalk. All work to occur will take place within the City right-of-way. Work shall be in accordance with project log documents, Special Provisions, Standard Details of the City of Kalamazoo, MDOT Standard Details R-28 and R-29 Series, the 2020 MDOT Standard Specifications for Construction, and Ordinances of the City of Kalamazoo in effect on the date of Invitation for Bids (Tree Ordinance is attached for review). Locations for work are as follows: Alamo Avenue (City Limit* - Denner) Cameron Street (Buena Vista - Bryant) Portage Street (Kilgore - Cork) Mt Olivet Rd (Virginia - G Avenue) * City Limit is approximately 280 feet west of Rockledge Court. All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor's unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price. Pedestrian detours shall be provided as needed in areas of heavy pedestrian traffic. The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder. Questions for this IFB should be directed to: Department Contact: Tom Palumbo, PE Senior Civil Engineer - Public Works at palumbot@kalamazoocity.org or 269-303-5142 The bid must be accompanied by a bid bond which shall not be less than five (5%) percent of the total amount of the bid. No bid will be considered unless it is accompanied by the required guarantee. The bid guarantee shall ensure the execution of the bid and award, and the furnishing of a performance bond and a labor and material bond (A and B below) by the successful bidder. (Contractors Note: A cashier's or certified check in lieu of a bid bond is NOT acceptable.) A performance bond shall be furnished in the full amount of the contract ensuring the City of faithful performance of all the provisions of the contract, and the satisfactory performance of any equipment required hereunder. The bond shall also ensure the City against defective workmanship and/or materials. A labor and material (payment) bond shall be furnished for the period covered by the contract, in the full amount of the contract for the protection of labor and material suppliers and sub-contractors. The bidder shall have all work completed by October 1, 2023. The design of this project was completed by the owner's in-house design professional. The scope of work for this project shall consist of removing and replacing sidewalk sections marked for removal on the streets indicated in the bid documents and constructing new sidewalk in the locations as specified in the appendices and drawings attached. Tree and brush trimming shall take place in accordance with this contract to allow for free passage of pedestrians along City sidewalk. All work to occur will take place within the City right-of-way. Work shall be in accordance with project log documents, Special Provisions, Standard Details of the City of Kalamazoo, MDOT Standard Details R-28 and R-29 Series, the 2020 MDOT Standard Specifications for Construction, and Ordinances of the City of Kalamazoo in effect on the date of Invitation for Bids (Tree Ordinance is attached for review). Locations for work are as follows: o Alamo Avenue (City Limit* - Denner) o Cameron Street (Buena Vista - Bryant) o Portage Street (Kilgore - Cork) o Mt Olivet Rd (Virginia - G Avenue) * City Limit is approximately 280 feet west of Rockledge Court. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Sidewalks / Parking Lot

$511,760.00

Public - City

Paving, Site Work

4

7

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
34
Bidding Soon
726
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 20, 2023

img_map_placeholder

Multiple Locations, Kalamazoo, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.