BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Prattville, Alabama. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Notice Content Notice to Contractors Federal Aid Project No. RACRNH-0006(587) AUTAUGA COUNTY, ALABAMA Sealed bids will be received by the Director of Transportation at the office of the Alabama Department of Transportation, Montgomery, Alabama until 10:00 AM on April 07, 2023 and at that time publicly opened for constructing the Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) Westbound Lanes and the Widening (Grading, Drainage, and Pavement), Planing, Resurfacing, and Traffic Stripe on SR-6 (US-82) Eastbound Lanes from the intersection of SR-14 to the intersection of SR-3 (US-31) to include Bridge Replacements over Autauga Creek and the Autauga Northern Railroad in Prattville. Length 2.350 mi. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. The Entire Project Shall Be Completed In One Hundred Fifty (150) Working Days. A 4.00% DBE Contract Obligation Is Required. A Bidding Proposal may be purchased for $5.00. Plans may be purchased for $91.00 per set. Plans and Proposals are available at the Alabama Department of Transportation, 1409 Coliseum Boulevard, Room E-108, Montgomery, AL 36110. Checks should be made payable to the Alabama Department of Transportation. Plans and Proposals will be mailed only upon receipt of remittance. No refunds will be made. Minimum wage rates for this project have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. This project is subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The bracket range is shown only to provide general financial information to contractors and bonding companies concerning the project's complexity and size. This Bracket should not be used in preparing a bid, nor will this bracket have any bearing on the decision to award this contract. The Bracket Estimate On This Project Is From $9,432,757 To $11,528,925 . The proposed work shall be performed in conformity with the rules and regulations for carrying out the Federal Highway Act. Plans and Specifications are on file in Room E-108 of the Alabama Department of Transportation at Montgomery, Alabama 36110. In accordance with the rules and regulations of The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The Alabama Department of Transportation, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000D TO 2000D-4 and Title 49 code of Federal Regulations, Department of Transportation, Subtitle A, Office of The Secretary, Part 21, nondiscrimination in federally-assisted programs of the Department of Transportation issued pursuant to such act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, or national origin in consideration for an award. The right to reject any or all bids is reserved. JOHN R. COOPER Transportation Director Pratt. Prog.03/17, 03/24, 03/31/2023 5629539

Bid Results

Bridges / Tunnels

$10,602,512.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

303

6

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
25
Bidding Soon
516
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2023

June 6, 2023

img_map_placeholder

AL-6 & US-82, Prattville, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.