Published April 20, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Tewksbury, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

*As of  March 17, 2023 this project has not yet been awarded. A timeline or award has not yet been established.**   The project consists of the construction of a new hot mix asphalt sidewalk along the western side of Fiske Street and portions of the northern side of Andover Street in the Town of Tewksbury, MA. The work in this Contract includes, but is not limited to, excavation and site leveling, sidewalk, driveway, and wheelchair ramp construction, installation of curbing, pavement markings, sign installation and adjustment, drainage structure and pipe installation, grading, adjustment of fencing, mailboxes, and retaining walls, erosion controls, and tree protection. The project also includes relocation of utility poles which is not a part of this contract. The Town of Tewksbury, Massachusetts, acting through its Department of Public Works invites sealed bids for "Town of Tewksbury, Massachusetts, "Fiske Street Sidewalk Improvements," Contract No."PW-23-09", in accordance with the Contract Documents prepared by BETA GROUP, INC., Consulting Engineers, 315 Norwood Park South, Norwood, Massachusetts, 02062. The location, general characteristics, and principal details of the Work are indicated in a set of drawings, entitled "Town of Tewksbury, Massachusetts , Fiske Street Sidewalk Improvements The project consists of the construction of a new hot mix asphalt sidewalk along the western side of Fiske Street and portions of the northern side of Andover Street in the Town of Tewksbury, MA. The work in this Contract includes, but is not limited to, excavation and site leveling, sidewalk, driveway, and wheelchair ramp construction, installation of curbing, pavement markings, sign installation and adjustment, drainage structure and pipe installation, grading, adjustment of fencing, mailboxes, and retaining walls, erosion controls, and tree protection. The project also includes relocation of utility poles which is not a part of this contract. This project is being funded in whole or in part by Chapter 90 funds. To bid on this project, Contractors must be prequalified in accordance with 720 CMR 5.00, Prequalification of Contractors by MassDOT. "Informational Only" copies of the Contract Documents will be available to any individual or firm. Bid Security: Certified, treasurer's or cashier's check or bid bond in the sum of five (5) percent of the Total Bid is required. Direct all inquiries to Dan McCormack, PE, BETA Group, Inc, 781-255-1982 All Bids for this project are subject to applicable bidding laws of Massachusetts, including General Laws Chapter 30, Section 39M as amended. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under this Contract as determined by the Department of Labor and Industries under provisions of the Massachusetts General Laws Chapter 149, Section 26-27, inclusive, as amended. No Bidder may withdraw their bid within Ninety (90) days after the actual date of the opening thereof. The successful Bidder must furnish 100 percent Performance and Labor and Materials Bonds and will be required to execute the Contract Agreement within five (5) days following notification of the acceptance of his Bid. The OWNER reserves the right to reject any or all bids, to accept any bid, to waive any informality on bids received, and to omit any item or items deemed advisable for the best interests of the OWNER. Bids are subject to Massachusetts-M.G.L. Chapter 30-Section 39M and to Massachusetts minimum wage rates as required by M.G.L. Chapter 149- Sections 26 to 27D inclusive. The award of the contract is contingent upon the availability and appropriation of funding by the Town. All costs associated with the preparation of the bids shall be the responsibility of the bidder, regardless of whether or not the Contract is awarded. The successful bidder shall certify that all employees at the worksite will have successfully completed a course in construction safety and health approved by the U.S. Occupational Safety and Health Administration (OSHA) that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll for each employee. The Owner and Engineer, being considered the sole and only judge, reserves the right to waive any informality in, or to reject, any or all bids, should the Owner deem it to be in the owner's best interest or the public interest to do so. Liquidated Damages for each consecutive calendar day of delay in completion time - $ 1,200.00 To receive consideration, such questions shall be submitted in writing or faxed to the Engineer (for this purpose, BETA Group, Inc., 315 Norwood Park South, Norwood, Massachusetts, 02062, Telephone No. (781) 255-1982, Fax No. (781) 255-1974 at least seven calendar days before the established date for receipt of Bids

Award

Roads / Highways

$834,528.00

Public - City

Paving, Site Work

34

11

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
171
Bidding Soon
3,020
All Active Projects
1,190
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

April 24, 2023

img_map_placeholder

Fiske St, Tewksbury, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.