BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Renton, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of March 31, 2023, project was awarded to R.W. Scott Construction Company, awarded amount is $2,222,124.91. **As of February 22, 2023 , an award has not yet been made. Per the owner, bid results will not be made available until after the award is announced. No time-frame is available for when this project will be awarded** Principal items of Work included in BOULEVARD LANES, PHASE 2 AC PIPE REPLACEMENT, CONTRACT 0I-2022W, are the replacement of approximately 5,920 lineal feet of existing 4-inch, 6-inch, 8-inch, and 10-inch asbestos concrete (AC) water main and 4-inch cast, iron (CI) water main with 4-inch, 8-inch, and 10-inch ductile iron (DI) water main; replacement of fire hydrants, valves, blow offs, meter boxes, and water service lines from the new water main to the meter, asphalt concrete patch and overlay: cement concrete driveway and sidewalk repair, cement concrete curb and gutter repair, relocation SCWSD customer side meter connections, and surface restoration. The existing water mains will be abandoned in place after being filled with controlled density fill (CDF) and the existing roadway will have a full width grind and overlay performed where new DI main has been installed. Neither the District nor Engineer wiil sell bid packages. Project questions can he directed to Engineer, Chris Schmidt PE,' at (206) 557-9107 or chns. schmidt@bhccon suItants. com. Each bid shall be accompanied by a bid security, in the form of a certified check, cashier's check, postal money order, or surety bond made payable to the order of Soos Creek Water and Sewer District for a sum not less than five (5) percent of the bid. SOOS CREEK WATER & SEWER DISTRICT reserves the right to reject any and all bids, waive any informalities m the bidding, and select whichever bids they determine to be the best value to the District for the Contract. No bidder may withdraw his bid for a period of thirty (30) days after the day of bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Total Contract Amount Bid Without Tax R.W. Scott Construction Co. - $2222125 Total Contract Amount Bid With Tax R.W. Scott Construction Co. - $$23,74,038

Award

Water / Sewer

$2,222,125.00

Public - City

Paving, Site Work

35

10

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
31
Bidding Soon
861
All Active Projects
366
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 20, 2023

img_map_placeholder

Multiple Locations, Renton, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.