BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Richmond, British Columbia. Completed plans call for the renovation of a educational facility.

Kwantlen Polytechnic University has identified approximately 3,300 sqm of the classroom, teaching support, office, passage, and common area spaces to be renovated to improve and update the overall experience for students, employees and visitors. A primary user of this space will be KPU’s Entertainment Arts program. The renovation will primarily focus on the interior space – the area that end users utilize. The upgrade will focus on the 2nd and 3rd-floor areas of the Richmond campus main building that have been designated for the suite of Entertainment Arts Programming. Both classroom space and offices for faculty, program assistants, and the Associate Dean responsible for Entertainment Arts will be required. The renovation will be required to be completed across 2 phases: Phase 1 relates to the 2nd Floor renovation, including the 3rd Floor Electrical and Communications rooms, and Phase 2 refers to the 3rd Floor renovation. Upgrading work should start on the 2nd Floor as the classroom space on the 3rd Floor is currently being used by students. Due to the critical impact of this project on classroom availability for the Fall Semester, the 2nd Floor renovations should be completed for Ready-for-Takeover by July 11th, 2023 and all construction for Phase 1 deficiencies flowing from the Readyfor-Takeover, must be completed by no later than August 24th, 2023. Once the 2nd Floor upgrade is complete, the classrooms can be outfitted with new furniture and KPU equipment. Upgrading on the 3rd Floor can begin once the 2nd Floor upgrade is complete. The University requires all the noisy construction work to be scheduled during weekends as the building is occupied and classes are scheduled throughout the construction period. The upgrades must deliver the digitally ready classrooms, including the necessary power and network connectivity to run 37 computers (35 students, plus 1 teaching assistant, plus 1 instructor) in each classroom. Each classroom must have workstations for 36 students, a teaching assistant, plus the instructor. In addition, one non-digital classroom will be required that is suitable for drawing, painting and working with other non-digital materials. Please refer to all documents attached to this competition for further details on the project specifications and other requirements. KPU anticipates the project value to be between the range of $ 2.5 Million - $ 3 Million, including alternatives. The Preferred Ready-for-Takeover time frame for Phase 1 is 12-16 weeks and Phase 2 is 8-11 weeks for this project. Documents can be obtained from https://kpu.bonfirehub.ca/

Post-Bid

Educational

$3,000,000.00

Public - State/Provincial

Renovation

74

20

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
29
Bidding Soon
1,600
All Active Projects
634
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.