BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Winnipeg, Manitoba. Design plans call for the construction of a 20,000-square-foot, four-story above grade educational facility; and for site work for a educational facility.

The University of Winnipeg has made the decision that Sparling Hall located in the centre of campus is at the end of its serviceable life and would like to explore possibilities for its replacement and the development of a new Student Success Centre in its place. The proposed new Student Success Centre is suggested to be approximately 20,000 square feet over 4 or more storeys - however the program document as part of this Proposal would inform the physical elements of the development. The development will include the transformation of "Lot B" (approx. 7,000 square feet in area) directly north of Sparling Hall into a pedestrian and bicycle friendly courtyard that complements the greenspace between Centennial Hall and Graham Hall and links to Marsha Hanen Way. The redevelopment of the Sparling Hall site for a new Student Success Centre is intended to be a high-performance building targeting Net Zero or Net Zero Ready status. Due to Sparling Hall's central location on campus, it has been considered an ideal location to house the central hub of a future district geothermal field planned for the campus and should be considered in the program document and schematic design of the new Student Success Centre. LEED Gold Certification may be pursued. The new Student Success Centre should demonstrate the University's values of accessibility, inclusion and reconciliation. The design should be considerate of the diversity of the campus and engage the campus and surrounding communities. The Student Success Centre should be a welcoming entrance into the centre of campus with ground floor access from both the south and north. The image of the new Student Success Centre should reflect the campus community it will serve. Incorporation of cultural elements and design concepts from the diverse University community is a project goal, and contributes to the University's to commitment to Reconciliation. TIMELINE: Preliminary design only. Project placed on hold. The anticipated construction budget of the project is approximately $15,000,000.00. Updates may be available late 2024.

Design

Educational

$15,000,000.00

Public - State/Provincial

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
49
Bidding Soon
527
All Active Projects
229
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 14, 2025

img_map_placeholder

515 Portage Ave, Winnipeg, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.