BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Sioux City, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and water / sewer project.

Each bid must be accompanied in a separate envelope by one of the following: a deposit of money, Certified Check, Cashier's Check, or Credit Union Certified Share Draft, or a Bid Bond to be executed by a corporation authorized to contract as a surety in the state of Iowa, in an amount equal to ten percent (10%) of the amount of the Bid, made payable to Western Iowa Tech Community College, Sioux City, Iowa, and may be cashed by the Board as liquidated damages in the event the successful Bidder fails to enter into a Contract and file a 100% performance and payment bond satisfactory to the Board assuring the faithful fulfillment of the Contract and maintenance of said improvements as required by law, the provisions of this notice and the Contract Documents within ten (10) days after acceptance of his Bid. The Owner will, in evaluating Bids, consider the requirements of the resident bidder preference law, and allow such preferences to resident bidders as are required to be allowed under State Law. Bidder shall, when submitting a Bid, furnish an executed Bidder Status Form for the Owner to use when applying the preference law. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. Bid Security of the two lowest Bidders will be retained until contract has been awarded and executed but no longer than 30 days after the opening of bids. No Bidder may withdraw his bid within 30 days after opening of bids. The successful Bidder will be required to furnish a Performance Bond and Material and Labor Payment Bond in an amount equal to one hundred percent (100%) of the Contract Sum, issued by a responsible surety approved by the Board and shall guarantee the faithful performance of the Contract and terms and conditions therein contained and the maintenance of said improvements pursuant to the provisions of the Contract Documents. Bids shall remain in effect for a period of thirty (30) days, commencing on bid due date. The Owner will issue tax exemption certificates to contractors and subcontractors on this project. Contractors and subcontractors may make copies of these certificates and give them to each supplier providing construction materials. Sales tax will not be charged on construction materials purchased using the tax exemption certificates. Monthly estimates will be paid to the Contractor as the work progresses in amounts equal to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work, partially or totally completed. Final payment of the five percent (5%) due the Contractor will be made thirty (30) days after final acceptance of the work under the Contract by the Owner if no claims are on file and after receipt of satisfactory evidence that all claims pertaining to such Contract have been paid in full as provided in the Contract Documents for said work. The Contractor shall begin work after receipt of a Notice to Proceed, which is anticipated to be issued on May 1, 2023. All work on the project shall be substantially complete on or before August 15, 2023 and ready for final acceptance on or before September 1, 2023. All bids shall be filed on forms included in the Project Manual, furnished by the Engineer, sealed and plainly marked. Any alteration of the bid form may be cause for rejection of the proposal. The WITCC Board of Directors reserves the right to reject any or all bids, re-advertise for all bids and to waive any or all formalities that may be in the best interest of Western Iowa Tech Community College.

Bid Results

Sidewalks / Parking Lot

$1,050,232.00

Public - State/Provincial

Paving, Site Work

28

14

10

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
29
Bidding Soon
451
All Active Projects
182
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 3, 2023

May 1, 2023

September 1, 2023

img_map_placeholder

4647 Stone Ave, Sioux City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.