BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Waialua, Hawaii. Completed plans call for the renovation of a educational facility.

Questions Deadline: 02/09/2023 Answers Due Date: 02/10/2023 Furnish materials, labor and equipment necessary to install new window A/C units at Wahiawa Middle School. This job is for the replacement/installation of Sixty-two (62) Window A/C units of various sizes as follows: 1. Building A - Rooms 5 to 10 - Two each 18,000btu window units 2. Building B - Rooms 1 to 5 - Two each 18,000btu window units 3. Building D - Rooms 101 to 104 - Two each 18,000btu window units 4. Building D - Rooms 201 to 204 - Two each 15,000btu window units 5. Portables - P-1 to P-9 - Two each 18.000btu window units 6. Cottage CT-1 - one each 12,000btu and one each 18,000btu unit 7. Cottage CT-2 - Two each 18,000btu units 8. Cottage CT-3 - Two each 18,000btu and one each 10,000btu units 9. Cottage CT-4 - One each 18,000btu unit 10. Administration Office: i. Media Center - One each 18,000btu unit ii. Principals - One each 8,000btu unit iii. Room One each 8,000btu unit I. Window Air Conditioning Units: a. All window A/C units shall be LG Dual Inverter series or a preapproved equal. b. Window A/C units will be framed with treated 2 x 4 and shall have minimum 1/2 " ACX treated plywood on the interior and exterior. c. All wood around the A/C units will be caulked and painted (interior and exterior). III. Condensation Drain lines a. All a/c units shall have a 1/2 " PVC drain lines. b. All drain lines shall be strapped securely to the wall and run from the a/c unit to approximately 6" above the existing finish grade. III. Electrical: a. Contractor shall provide all necessary components for a complete installation of all A/C units; including but not limited to conduits, wiring, outlets, breakers, etc. b. All exposed conduits shall be EMT with watertight fittings and must be painted to match surrounding areas. c. Contractor shall also be responsible to provide sub-panels and breakers where necessary. All new sub-panels shall be lockable commercial type and must match existing 3 phase electrical systems so as to not create an imbalance of power. IV. Patching a. All penetrations through walls/windows shall be completely sealed. b. All added and/or replaced lumber and/or plywood shall be patched and painted. Wood trim shall be used for gaps larger than 1/4 inch. c. Any damages caused by the Contractors work shall be properly patched and painted to match surrounding areas. Project Coordinators: Marjorie Pudiquet (808) 305-4272 Marjorie.Pudiquet@k12.hi.us Clayton Haida (808) 271-4774 Clayton.Haida@k12.hi.us

Award

Educational

$92,345.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
25
Bidding Soon
255
All Active Projects
103
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 15, 2023

March 17, 2023

June 30, 2023

img_map_placeholder

67 Waialua Beach Rd, Waialua, HI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.