BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Lufkin, Texas. Completed plans call for the renovation of a medical facility.

A. This project is for the EHRM Infrastructure Upgrades Lufkin CBOC located in the Houston Texas area. All construction work shall adhere to the latest joint Commission Standard, NFPA, and life safety requirements. All work shall be performed per the contract specifications, drawings, and attached documents herein. B. Contractor shall use the attached US Department of Labor Wage Determination TX20220253 in accordance with the Davis Bacon Act. C. The magnitude of construction is between $100,000 and $250,000 per FAR 36.204 and VAAR 836.204. Bid Bonds, Payment Bonds, and Performance Bonds are required if proposal exceeds $150,000.00 D. NAICS code for this project is 236220 with a small business size standard of $39.5 Million. E. This is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside competitive procurement pursuant to Public Law 109-461 (38 USC 8127). The SDVOSB is required toperform a minimum of 15% of the construction work. The SDVOSB must be a small business under the relevant NAICS code. Vendors submitting proposals under a Joint Venture shall submit a copy of their Joint Venture agreement with their offer. Joint Ventures shall comply with VAAR 819.7003(c). F. IMPORTANT: All SDVOSB contractors shall be Center for Verification and Evaluation (CVE) verified with the assigned NAICS code in order to receive contract award. Visit the following website for more information: www.vip.vetbiz.va.gov G. Offerors shall be actively registered in SAM and be verified in VetBiz at the time offers are due. Offers may be rejected if they do not comply with this requirement. H. Deadline for solicitation inquires is 3/27/2023 by 23:59CST. Questions shall be emailed to Kenny.Holestin@va.gov. I. 580-23-2-5965-0019 Contractor shall furnish all supervision, labor, material, tools, and equipment to fully complete the EHRM Infrastructure upgrade at the Lufkin CBOC location located in the Houston, Texas area. BASIS OF AWARD: A single or multi award could be made for line Items No. 1. Offerors shall provide a total contract price on each line item listed Site Visit: 3/20/2023 @ 1030am CST. Meet at main lobby. RFI's Close: 3/27/2023 @ 11:59pm CST RFP Close: 4/6/2023 @ 11:59pm CST. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$250,000.00

Public - Federal

Renovation

3

9

2

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
16
Bidding Soon
349
All Active Projects
127
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2023

December 13, 2023

img_map_placeholder

2206 N John Redditt Dr, Lufkin, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.