Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a municipal facility in Hamburg, New York. Conceptual plans call for site work for a municipal facility.
The Village of Hamburg intends to develop a BOA Nomination for an approximately 200-acre portion of the Village's historically industrial zone. Dubbed the West End Corridor (WEC), the study area contains underutilized legacy sites and perceived environmental challenges that have discouraged redevelopment. The objective is to build public consensus on a vision for key legacy industrial sites, future land use and development patterns, improvements to access and safety of the area's transportation network, and the differentiation of the WEC neighborhood identity. The WEC boundary is oriented along Lake Street (NY-75) on the east and still active railroad on the west. According to an Underutilized Sites Strategy completed on the WEC in 2016, there are two strategic areas that provide opportunities for targeted redevelopment. One is an industrial area that contains more than 10 clustered properties that are underutilized, vacant, and/or brownfield properties ripe for development. The second area is the Lake Street (NY-75) commercial corridor, which acts as a main gateway into the Village and contains multiple underutilized properties. The Study will build public consensus on future development patterns, including some currently vacant/underutilized portions of the West End. Specifically, the Study will seek transportation, land use, and development recommendations including, but not limited to, plans for a road diet, additional landscaping, design guidelines, and zoning updates. The project will also identify opportunities to expand utilization, access, and safety of the transportation network to connect adjacent neighborhoods with the West End Corridor. This BOA Nomination Study builds upon prior planning efforts, including the 2016 Underutilized Sites Strategy funded by a strategic planning grant from the office of Empire State Development. Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Contract term: 14 months The method of Contractor Selection has not been Determined at this time.
Conceptual
Municipal
$200,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 20, 2024
To Be Determined, Hamburg, NY
Related To This Project
Hamburg, NY
Bid Date: Jun 12 2024
Hamburg, NY
Bid Date: Jun 26 2024
Hamburg, NY
--
Hamburg, NY
--
Hamburg, NY
--
Hamburg, NY
--
Hamburg, NY
Bid Date: Sep 19 2024
Hamburg, NY
Bid Date: Jun 26 2024
Hamburg, NY
Bid Date: Jun 06 2024
Hamburg, NY
--
Hamburg, NY
Bid Date: May 24 2024
Hamburg, NY
--
Hamburg, NY
--
Hamburg, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.