BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Hamburg, New York. Conceptual plans call for site work for a municipal facility.

The Village of Hamburg intends to develop a BOA Nomination for an approximately 200-acre portion of the Village's historically industrial zone. Dubbed the West End Corridor (WEC), the study area contains underutilized legacy sites and perceived environmental challenges that have discouraged redevelopment. The objective is to build public consensus on a vision for key legacy industrial sites, future land use and development patterns, improvements to access and safety of the area's transportation network, and the differentiation of the WEC neighborhood identity. The WEC boundary is oriented along Lake Street (NY-75) on the east and still active railroad on the west. According to an Underutilized Sites Strategy completed on the WEC in 2016, there are two strategic areas that provide opportunities for targeted redevelopment. One is an industrial area that contains more than 10 clustered properties that are underutilized, vacant, and/or brownfield properties ripe for development. The second area is the Lake Street (NY-75) commercial corridor, which acts as a main gateway into the Village and contains multiple underutilized properties. The Study will build public consensus on future development patterns, including some currently vacant/underutilized portions of the West End. Specifically, the Study will seek transportation, land use, and development recommendations including, but not limited to, plans for a road diet, additional landscaping, design guidelines, and zoning updates. The project will also identify opportunities to expand utilization, access, and safety of the transportation network to connect adjacent neighborhoods with the West End Corridor. This BOA Nomination Study builds upon prior planning efforts, including the 2016 Underutilized Sites Strategy funded by a strategic planning grant from the office of Empire State Development. Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Contract term: 14 months The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
81
Bidding Soon
2,203
All Active Projects
934
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.