BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in North Adams, Massachusetts. Completed plans call for the renovation of a educational facility.

HVAC Upgrade at Drury High School at 1130 Church Street, North Adams, MA 01247. HVAC Upgrade at Drury High School to include Air quality sensor installation, UV Lighting,Fan/VFD Improvements, and BMS Upgrade. Air quality sensor installation: - Constant Volume AHU / RTU o Add a CO2/VOC sensor to the return duct of the following locations: - Common to RTU 1,2,3 - Common to AHU 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15 o Wire sensor to available control points on existing controller (add additional controller/points were necessary to accommodate new sensor) - Code to be implemented for the following Sequence: o Constant Volume Units - At the RTU/AHU Level: - On an increase of CO2 above setting (initially set for 900 ppm), or elevated VOC (baseline to be established by using 100% OA for a period of 4 hours and sensing that level) Econ dampers shall slowly modulate open to lower CO2 level returning from the space o Variable Air Volume Units -When the respective AHU senses an increase in CO2 or VOC - all VAV's served by that AHU will index to Max Flow Settings. o Notes - Safeties on the RTU / AHU remain in play - Econ Damper position should always monitor Mixed Air Temperature and back off damper command when this reading drops below 45 Deg. F (adjustable) UV Lighting: - Basis of design is Steril-Aire UVC Lamps for HVAC (Flow Tech is the local Rep) o Complete with retrofit mounting kit, factory controller with outputs for lamp loss and/or lamp status, and door switch (to de-energize the lamps when the door is opened) - Installation to include: o Complete lamp kit o 110 VAC power source to lamp controller - Locate nearest breaker and provide local disconnect o BMS Integration -To include control wiring, point creation, BMS graphic changes, BMS alarms - Existing system is Andover Continuum

Award

Educational

$305,471.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
102
Bidding Soon
1,584
All Active Projects
718
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2023

March 20, 2023

img_map_placeholder

1130 Church St, North Adams, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.