BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Alpharetta, Georgia. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The PATH400 Trail Extension is a proposed 12 wide concrete shared-use path approximately 2.3 miles in length. The project begins at the northern terminus of the proposed PATH400 Trail at Loridans Drive in Atlanta and parallels SR400 along the east side primarily within the right-of-way. The trail continues north through the former toll plaza, bridges Nancy Creek, crosses Windsor Pkwy, continues under Northland Drive with an at-grade connection, parallels Morgan Oak Circle (adjacent to Ridgeview Charter Middle School), crosses over the existing Glenridge Connector Ramps and under the existing Glennridge Connector with an at-grade connection, and ties into the trail portion of the under construction I-285/SR400 interchange improvement project just south of Johnson Ferry Road. County: Fulton As of February 02, 2023, the project is in Final Planning status. Anticipated letting Month is May, 2023. GADOT - Path 400 Trail From Loridans DR to Sandy Springs City Limits *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Sidewalks / Parking Lot

$4,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
90
Bidding Soon
1,523
All Active Projects
676
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

img_map_placeholder

GA-400, Alpharetta, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.