Site work and renovation of a mixed-use development in Gillette, Wyoming. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Campbell County School District Concrete Repairs Wyoming preference will be given, according to the School Board Policy. The Campbell County School District reserves the right to accept or reject any or all bids and to waive any irregularities or informalities in biddings. The work in this contract is to remove and replace damaged concrete as requested throughout the District. Bid pricing will be based on the awarded Contractor supplying all labor, equipment, forms and tooling for the work to be completed at single site. "Large project" is defined as 2yds of concrete or more. "Small project" is defined as less than 2yds of concrete.Preparation: 1. Remove and dispose of existing concrete, sod, soil, and other debris. 2. Maintain existing water content of soil during removal and replacement process (Do not allow to dry out). 3. Prepare subgrade to match finished concrete slope. Hold slope of landings and walks to 2% lateral and away from buildings. Longitudinal slope along walks shall not exceed 5%. Slope along a flow line shall be 2% minimum unless design indicates otherwise. Slope perpendicular to a flow line shall be 2% minimum, 5% maximum Landings at steps shall slope 2% maximum each direction. 4. Where concrete is to be poured abutting existing concrete, #4 rebar dowels shall be installed, at 16" spacing into existing foundations, walls and slabs. Dowels shall be 12" long and shall be epoxy anchored 4" to 5" into existing concrete, locate dowels at center of concrete slab. 5. Set forms and brace substantially to lines and grades indicated. Place #3 reinforcing bars at 16" spacing each way, (6" maximum from edges) and provide rigid supports on a 36" grid pattern to hold bars at center of slab. Concrete: 1. Shall be a minimum 4000 PSI 28 day strength. 2. Provide minimum 6 sacks of Type 11 cement per cubic yard. 3. Slump of concrete shall not exceed 4". 4. Do not use fly ash or fiber mesh. 5. Hold lateral slope along walks to 2% away from building. Longitudinal slope of walks shall not exceed 5%. Slope along a flow line shall be 2% minimum unless design indicates otherwise. Slope perpendicular to a flow line shall be 2% minimum 5 % maximum. 6. Control joints shall be placed a maximum distance of 1 1/2 times walkway widths. 1/2" expansion joints shall be at approximately 30'maximum, shall have 1/2" smooth dowels (lubricated) through joint at 16", and shall be caulked with Dow 888. Control joints in slabs and walks shall be spaced no greater than 15'and shall be such that distance between joints does not exceed 1 1/2 times spacing of joints in the opposite direction. 7. Concrete shall be straight, smooth, and have a light broom finish to provide a uniform skid resistant surface without pulling aggregate loose, or creating deep or uneven scoring of the cement matrix. Care shall be exercised to maintain a linear slope adjacent to and away from face of building. Concrete shall not have a depression or back slope adjacent to face of building. 8. Concrete shall be protected until adequately cured to prevent damage by exposure, natural occurrences, or vandalism Any questions in regard to this bid should be directed to: Sean Mathes Supervisor of Buildings & Grounds 109 N. Gurley Ave. Gillette Wyoming 82716 Phone 307-682-2750 Question Cutoff Date: 2/20/2023 12:00 PM (ET)

Award

Educational

$1,000,000.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
6
Bidding Soon
35
All Active Projects
15
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2023

July 1, 2023

img_map_placeholder

Multiple Locations, Gillette, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.