BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Stockton, Missouri. Contact the soliciting agency for additional information.

For Professional Engineering Services The City of Stockton is requesting Statements of Qualifications for professional engineering services to assist with the preparation of an Engineering Report to assess the City's public water supply system and provide a detailed analysis of the existing water system, assemble a hydraulic water model, provide history, document deficiencies, project future demands, and make recommendations for proposed improvements to meet current and future needs. Funding for the report is expected to be through the Missouri Department of Natural Resources Drinking Water Engineering Report Grant program. The report should adhere to the Minimum Design Standards for Missouri Community Water Systems effective Dec. 10, 2013. Information provided in the Statement of Qualifications must include:A. The specialized experience and technical competence of the firm with respect to public water supply systems; B. The capacity and capability of the firm to perform the work in question, including specialized services, within the time limitations fixed for the completion of the project; C. The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules; D. The firm's proximity to and familiarity with the area in which the project is located. E. Resumes of key personnel assigned to this project. Once the most qualified firm is selected, an engineering agreement will be negotiated. The engineering agreement may be amended to include design and construction engineering services. The City of Stockton is an Equal Opportunity Employer and invites the submission of proposals from Women and Minority Business Enterprises. For more information, please contact Ms. Vanessa Harper, City Clerk, at 417-276-5210. The method of contractor selection has not been determined at this time

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
13
Bidding Soon
327
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2023

img_map_placeholder

Multiple Locations, Stockton, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.