Published November 18, 2024 at 7:00 PM
Updated November 19, 2024
Site work for a water / sewer project in Temple Terrace, Florida. Completed plans call for site work for a water / sewer project.
This project is to design and construct a solution to alleviate flooding at the intersection of E 127th Avenue and Rolling Hills Court. 127th Avenue Drainage Improvements Project generally involves the improvement and modification of the existing stormwater wet well on 127th Avenue. 1. Excavation, backfill and compaction for underground utilities 2. Installation of a new water system via open cut and HDD installation3. Temporary by-pass piping operations 4. Testing of installed systems 5. Restoration and site clean-up This project is in included in the City of Temple Terrace's FY 2022 - 2023 Capital Improvement Plan (CIP). As of June 2, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. East 127th Avenue Stormwater Improvements involves the replacement and modernization of the existing stormwater lift station to its permitted condition. The project includes rehabilitation of the pump station structure; new top slab and access hatch; new pumps, piping, valves, fittings, and appurtenances; electrical, instrumentation, diesel pump; connection to existing 10-inch force main; removal of asphalt; gravel bed yard; and other items as indicated on the plans. DEADLINE FOR CLARIFICATION REQUESTS: 4:30 p.m. EST on October 9th, 2024 Scope- The project may also include the removal and replacement of trees, sod, curbing, sidewalk, and asphalt pavement removal and replacement as shown on the plans. As each section is completed it shall be flushed, pressure tested, as built, and cleared in accordance with the project specifications and the requirements of the City and FDEP prior to being placed into service.
Award
Water / Sewer
$608,169.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2024
November 15, 2024
E 127th Ave, Temple Terrace, FL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.