BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Gretna, Louisiana. Completed plans call for the renovation of a detention facility.

Labor & Materials Necessary to Remove, Replace & Install eleven (11) water source heat pumps for the Jefferson Parish Correctional Center We extend this proposal to provide labor, materials, equipment, transportation, and all other incidentals necessary to remove eleven (11) existing Water Source Heat Pump(s) and supply and install eleven (11) new Trane Standard Efficiency Water Source Heat Pump(s) or owner reviewed and approved equal systems at the Jefferson Parish Correctional Center located at 100 Dolhonde Street, Gretna, LA 70053. License(s) issued by the Louisiana State Licensing Board for Contractors: Mechanical Statewide Failure to comply will cause the bid to be rejected. The license number must be entered in the appropriate field in the electronic procurement system. o Surety Bond: An Electronic bid bond will be required with bid submission in the amount of 5% of the total bid. The vendor shall indicate the electronic bid bond number in the location specified on the electronic bid envelope. No scanned paper copies of any bid bond will be accepted as part of the electronic bid submission. o Performance Bond: A Performance Bond in the amount of 100% of the total contract price will be required. The performance bond shall be produced upon contract execution. o Payment Bond: A Payment Bond in the amount of 50% of the total contract price will be required. The payment bond shall be produced upon contract execution. We extend this proposal to provide labor, materials, equipment, transportation, and all other incidentals necessary to remove eleven (11) existing Water Source Heat Pump(s) and supply and install eleven (11) new Trane Standard Efficiency Water Source Heat Pump(s) or owner reviewed and approved equal systems at the Jefferson Parish Correctional Center located at 100 Dolhonde Street, Gretna, LA 70053.

Award

Jails / Prisons

$165,498.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
33
Bidding Soon
527
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

March 30, 2023

img_map_placeholder

100 Dolhonde St, Gretna, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.