Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 21, 2023 at 8:00 PM
Updated January 26, 2024
Site work, paving and renovation of a mixed-use development in Waupun, Wisconsin. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.
This project is being let using the single prime bidding and contracting process. DFD will publicly bid the24 applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 525 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each26 applicable MEP division of work. These successful MEP bids must be included in all general prime27 contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will28 publicly open general prime contractor bids. General prime contractor bids that do not include the29 successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified,30 responsible, certified general prime contractor and this general prime contractor will enter into subcontracts31 with the successful MEP bidders. In general the work consists of the construction of a water treatment plant for radium removal including a horizontal pressure filter for radium removal, masonry building, electrical, plumbing and HVAC; electrical and process improvements at existing well buildings #3 and #4, underground utilities including boring and jacking below a railroad, and related asphalt, concrete and turf restoration Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing19 wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. The MEP Subcontractor scope of work is identical to the General Prime Contractor 39 scope of work included in these bidding and contract documents. By submitting and signing a bid, 40 all bidders have examined all of the Bidding Documents listed in the Table of Contents of the project 41 specifications. The successful bidders will be required to do all work which is shown on the 42 drawings, mentioned in the specifications, or reasonably implied as necessary to complete the 43 division of work bid for this project. Bid Results - Plumbing - North American Mechanical, Inc - $ 99,850.00 HVAC - Rohde Brothers, Inc - $ 124,000.00 Pieper Electric, Inc. - Electrical - $ 918,993.00
Bid Results
Water / Sewer
$1,142,843.00
Public - State/Provincial
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 8, 2023
May 1, 2023
1 W Lincoln St, Waupun, WI
Related To This Project
Waupun, WI
Bid Date: May 04 2023
Waupun, WI
Bid Date: Mar 22 2023
Waupun, WI
Bid Date: Mar 02 2023
Waupun, WI
Bid Date: Nov 15 2023
Waupun, WI
Bid Date: Apr 26 2023
Waupun, WI
Bid Date: Aug 08 2023
Waupun, WI
Bid Date: May 25 2023
Waupun, WI
Bid Date: May 18 2023
Waupun, WI
Bid Date: Jan 25 2023
Waupun, WI
Bid Date: Jan 25 2023
Waupun, WI
Bid Date: Jan 25 2023
Waupun, WI
Bid Date: Jan 18 2023
Waupun, WI
Bid Date: Aug 12 2022
Waupun, WI
Bid Date: Aug 31 2022
Waupun, WI
Bid Date: Jul 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
