Site work, paving and renovation of a mixed-use development in Waupun, Wisconsin. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the24 applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 525 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each26 applicable MEP division of work. These successful MEP bids must be included in all general prime27 contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will28 publicly open general prime contractor bids. General prime contractor bids that do not include the29 successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified,30 responsible, certified general prime contractor and this general prime contractor will enter into subcontracts31 with the successful MEP bidders. In general the work consists of the construction of a water treatment plant for radium removal including a horizontal pressure filter for radium removal, masonry building, electrical, plumbing and HVAC; electrical and process improvements at existing well buildings #3 and #4, underground utilities including boring and jacking below a railroad, and related asphalt, concrete and turf restoration Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing19 wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. The MEP Subcontractor scope of work is identical to the General Prime Contractor 39 scope of work included in these bidding and contract documents. By submitting and signing a bid, 40 all bidders have examined all of the Bidding Documents listed in the Table of Contents of the project 41 specifications. The successful bidders will be required to do all work which is shown on the 42 drawings, mentioned in the specifications, or reasonably implied as necessary to complete the 43 division of work bid for this project. Bid Results - Plumbing - North American Mechanical, Inc - $ 99,850.00 HVAC - Rohde Brothers, Inc - $ 124,000.00 Pieper Electric, Inc. - Electrical - $ 918,993.00

Bid Results

Water / Sewer

$1,142,843.00

Public - State/Provincial

Paving, Renovation, Site Work

124

35

16

8

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
133
Bidding Soon
1,359
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

May 1, 2023

Project location map

1 W Lincoln St, Waupun, WI

Fuel growth with access to the bidding project info your business needs.