BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Kalamazoo, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of March 24, 2023, the project has been awarded. A timeline for construction has not been confirmed. Summary It is the intent of these plans and specifications to provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the 2023 SIDEWALK GAP PROJECT as described in the specifications and bid document. The scope of work for this project shall consist of placing new 5-foot concrete sidewalk sections in areas of the City's pedestrian network where there currently is a "gap". Construction will require removal of some existing sections of sidewalk to facilitate new sidewalk placement and cohesive pedestrian access. Work will involve removal, excavation, and preparation for placement of new 5-foot concrete sidewalk according to plans. All work to occur will take place within the City right of way. New sidewalk placement will be in accordance with the plan set, special provisions, MDOT Standard Detail R-28 and R-29 Series, and the 2020 MDOT Standard Specifications for Construction. Sidewalk ramps and landings are planned for installation at intersections and key crossing areas. Locations for work, with any specified dates when construction should occur, are as follows: Fraternity Village Drive: Dead End to W. Michigan Ave Construction should occur between May 1, 2023, and August 25, 2023 California Ave: Fraternity Village Dr to W. Michigan Ave Construction should occur between May 1, 2023, and August 25, 2023 1003 Berkshire Drive: In front of residency and approximately 200' either direction Harrison Street: E. Michigan Ave to Railroad Construction should complete before August 1, 2023 Park Street: Midtown Fresh Driveway to Balch St Springmont Ave: Barnard Ave to Oakland Dr New for the 2023 construction season will be the use of Porous Pave (TM) for hardscape restoration areas. Porous Pave (TM) allows for a permeable surface to be placed that requires little maintenance but allows for water infiltration. For further information on the product and installation techniques please visit www.porouspaveinc.com. All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor's unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price. The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work. The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder. The bidder shall have all work completed by September 15, 2023 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Sidewalks / Parking Lot

$524,753.00

Public - City

Paving, Site Work

64

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
149
Bidding Soon
1,415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

March 20, 2023

Project location map

Multiple Locations, Kalamazoo, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.