Site work and paving for a road / highway in Frankfort, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

General Specifications Apply In-Place Asphalt Paving and/or Asphalt Pavement Milling and Texturing to marked locations within the project county. Shoulder Pavement Texturing (rolled in rumble strips) are required when the paving extends onto shoulders in accordance with Section 403.03.08 at no additional cost to the Department. Pavement striping will be applied at the Engineer's discretion per the existing field conditions prior to nightfall on the same day that the patch is placed. Striping cannot be required without a patching order unless through a mutual agreement between the user and Vendor. The price for striping will not be bid but will be established at $0.56 per linear foot for 4" or 6" stripes with a guaranteed minimum striping quantity of 1,500 linear feet per delivery order. Sections to be paved and/or milled will be marked by the Engineer, and a list of locations by milepoint with the tonnage and striping quantities will be furnished to the Contractor through the issuance of a written Transportation Delivery Order. Contract Bid Items shall consist of: Asphalt Paving, Unit = Ton. Asphalt Pavement Milling and Texturing, Unit = Day Edge Key, Unit = Linear Foot The minimum quantity for an Asphalt Pavement Delivery Order will be 500 tons. If the Department requests less than 500 tons, the Department will pay a premium rate of $20 per ton in addition to the bid price for quantities between 100 tons and 300 tons, or $10 per ton for quantities greater than 301 tons but less than 499 tons. Orders of 500 tons or greater will be paid at the unit bid price. The minimum quantity for asphalt pavement milling and texturing will be one (1) day per Delivery Order. Delivery Orders may be placed for milling without any paving. The millings will become the property of the Vendor. The Vendor will be responsible for hauling the millings. Conform to Section 408. Mobilization/Demobilization for milling machine price is a round trip fee. The Department will only pay one mobilization/demobilization for milling machine fee per each Delivery Order. Mobilization between work sites shall be incidental. Delivery Orders for milling will be placed per county but may include multiple locations in that county. Mobilization/demobilization for milling machine will not be bid but will be established at $1,900 each. When requested by the Department, construct Edge Keys at the beginning and end of each patch or other locations as directed by the Engineer. Cut out the existing asphalt surface at a depth of one (1) inch per three (3) feet of width and heel the new surface into the existing surface. The Department will measure the Edge Key at the joint as the width of the pavement (three feet) perpendicular to the centerline in linear feet. The Department will pay for this work at the Line Item unit price per linear foot, which shall be full compensation for all labor, equipment, and incidentals for removal and disposal of the existing asphalt surface required to construct the edge key. Mobilization for Edge Keys will be incidental to the line item Edge Key. To allow smooth entry and exit ramps onto the patch, the minimum paved length shall be 50 feet, and the vertical transition at the patch ends shall not exceed 1/4 " per foot. Although the haul bill within the project county shall be incidental, the Engineer will attempt to geographically group the paving locations as to reasonably accomplish a 200-ton daily production. Asphalt Tack Coat shall be incidental; however, material certification is required. The application rate shall in accordance to the current KYTC Standard Specification for Road and Bridge Construction and Supplemental Specifications. Traffic Control shall be supplied by the Vendor according to the Manual on Uniform Traffic Control Devices, current edition, at no additional cost to the Department. The Vendor will have 90 calendar days from the receipt of the Delivery Order to complete the paving. The Vendor shall notify District Project Delivery and Preservation personnel 48 hours prior to starting a given Delivery Order to allow for scheduling an on-site inspector A Vendor shall submit an in-place bid price for each county in which they can supply paving per the terms and conditions of this Solicitation and the Standard Specifications. That bid price will be applicable to all locations within the geographical boundary of that county. By bidding and accepting a Contract, Vendors agree to treat the Department as a preferred and priority customer. Failure to do so may be cause for Contract cancellation. When service is not provided according to the Contract, the Division of Purchases reserves the right to make the purchase on the open market, with any cost in excess of the Contract price to be paid by the successful bidder. Except as provided herein, conform to all requirements of the Transportation Cabinet's Current Standard Specifications for Road and Bridge Construction. Section references herein are to the Cabinet's Current Standard Specifications for Road and Bridge Construction. Question Deadline 02/17/2023 at 12:00 PM ET Deadline for written questions All questions shall submitted in writing by the date and time specified. No questions shall be accepted after the date/time listed unless the question(s) is considered material to the procurement. Oral questions will not be accepted at any time except for bid procedural clarifications. The Commonwealth will respond to salient questions in writing by issuing an Addendum to the Solicitation.

Post-Bid

Roads / Highways

$450,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
230
Active Projects
127
Bidding Soon
1,717
All Active Projects
860
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 27, 2023

March 29, 2023

June 27, 2023

img_map_placeholder

Multiple Locations, Frankfort, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.