BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Rockford, Illinois. Design plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.

As of December 26, 2023, a design team has been selected. Construction timeline has not been identified. Job No. P-92-087-23, US 20 from 0.2 Mi. W. of Pecatonica Rd to 0.2 Mi. W. of Falconer Rd, Phase I Project, Winnebago County, Region Two/District Two. This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 3, 2023, at 10:30 AM at the Region Two/District Two Office in Dixon. Phase I engineering services are required for the rehabilitation / rubblization of US 20 from 0.2 Mi. W. of Pecatonica Rd to 0.2 Mi. W. of Falconer Rd in Winnebago Co. The project is expected to include the preparation of a design report (anticipated to be a state approved categorical exclusion). The scope of work may include, but is not limited to, rehabilitation / rubblization, profile analysis, geometric improvements including Restricted Crossing U-Turn Intersections (RCUTs), across road and entrance culverts extension or replacement, hydraulic analysis, drainage/storm sewer design, public involvement, and coordination with other agencies. The estimated construction cost for this project is $17,525,000. The completion date for this contract will be 30 months after authorization to proceed. The Prime firm must be prequalified in the Location Design Studies (Rehabilitation) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 20 - RFQ Engineering - US 20 from 0.2 Mi. W. of Pecatonica Rd to 0.2 Mi. W. of Falconer Rd, Phase I Project, Winnebago County, Region Two/District Two

Design

Roads / Highways

$17,525,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
162
Bidding Soon
3,704
All Active Projects
1,451
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2024

August 23, 2026

img_map_placeholder

US-20, Rockford, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.