BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Dixon, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of February 29, 2024, a design team has been selected. Job No. V-92-006-23, Bridge Bundle, Phase I/II Project, Various Counties, Region Two/District Two. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 26, 2023, at 10:30 AM at the Region Two/District Two Office in Dixon. Phase I and II engineering services are required for preparation of multiple Phase I project reports (anticipated to be categorical exclusions) and the preparation of contract plans for four structures. The first project is for the removal and replacement of IL 78 over Muddy Plum River, 2.5 Mi. N. of Carroll Co. Line. The second project is for the removal and replacement of the structure that carries IL 78 over Davis Creek, 0.5 Mi N. of Carroll Co. Line. The third project is for the removal and replacement of a bridge that carries W. Lincolnway over Union Pacific RR, 1.3 Mi. N. of US 30. The fourth project is for the removal and replacement of the bridge that carries IL 72 over Mud Creek, 1.2 Mi. E. of Main St. in Leaf River. The department will complete the bridge borings for the structures, but SGRs will be completed by the Consultant. The preparation of the Bridge Condition Reports (BCR) will be required for each of the structures. The estimated construction cost for this project is $8,850,000. The completion date for this contract will be 48 months after authorization to proceed. The Phase I portion is expected to be completed in 24 months and the Phase II portion Is expected to be completed in 24 months. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 24 - RFQ Engineering - Bridge Bundle, Phase I/II Project, Various Counties, Region Two/District Two

Award

Bridges / Tunnels

$8,850,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
79
Bidding Soon
1,660
All Active Projects
666
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 1, 2024

February 23, 2028

img_map_placeholder

Multiple Locations, Dixon, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.