Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Dixon, Illinois. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of December 26, 2023, a design team has been selected. Construction timeline has not been identified. Job No. V-92-007-23, Bridge Bundle, Phase I/II Project, Various County, Region Two/District Two. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 27, 2023, at 1:30 PM at the Region Two/District Two Office in Dixon. Phase I and II engineering services are required for preparation of multiple Phase I project reports (anticipated to be categorical exclusions) and the preparation of contract plans for five structures. The first project is for the removal and replacement of a culvert that carries I-80 over drainage ditch, 1.6 Mi. E. of IL 78. The second project is for the design of a new culvert on I-80 over a creek SE of IL 78 in Annawan. The third project is for the removal and replacement of a culvert that carries Andalusia Rd over Sand Creek, 0.7 Mi. E. of IL 92 in Rock Island. The fourth project is for the removal and replacement of the bridge that carries IL 78 over Coal Creek, 2.0 Mi. N. of Annawan. The fifth project is for the removal and replacement of a bridge that carries IL 92 over Fancy Creek, 0.5 Mi. E. of Andalusia. The Department will complete the bridge borings for the structures, but SGRs will be completed by the Consultant. The preparation of the Bridge Condition Reports (BCR) will be required for each of the structures. The estimated construction cost for this project is $7,950,000. The completion date for this contract will be 48 months after authorization to proceed. The Phase I portion is expected to be completed in 24 months and the Phase II portion is expected to be completed in 24 months. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Location Design Studies (Rehabilitation) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 25 - RFQ Engineering - Bridge Bundle, Phase I/II Project, Various County, Region Two/District Two
Design
Bridges / Tunnels
$7,950,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2024
Multiple Locations, Dixon, IL
Related To This Project
Dixon, IL
Bid Date: Feb 24 2023
Dixon, IL
Bid Date: Mar 10 2023
Dixon, IL
Bid Date: Mar 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.