Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Billings, Montana. Completed plans call for site work for a water / sewer project.
The Project generally consists of the following major work items: Zone 1 Sewer: Princeton Avenue Area The Zone 1 project area includes the alleys north and south of Princeton Avenue between Michigan Street and Wisconsin Street. The work in Zone 1 includes 1,180 linear feet of 8-inch sanitary sewer main replacement, manholes, service reconnections, and associated work. Bid alternates are provided for open cut replacement and cured-in-place pipe (CIPP) lining the existing sewer main. Zone 2 Sewer: Ponderosa Drive Area The Zone 2 project area includes a portion of Ponderosa Drive south of Poly Drive. The work in Zone 2 includes 360 linear feet of 8-inch sanitary sewer main (both open cut replacement and CIPP lining the existing sewer main), manholes, lining existing manhole, service reconnections, and associated work. Zone 3 Sewer: Burlington Avenue Area The Zone 3 project area includes the Burlington Avenue area between 13th Street West and 10th Street West; 12th Street West between Lewis Avenue and Burlington Avenue; Cottage Lane north of Lewis Avenue; Romelda Lane north of Burlington Avenue; and Wunnicke Lane north of Burlington Avenue. The work in Zone 3 includes 2,615 linear feet of 8-inch sanitary sewer main replacement, manholes, service reconnections, and associated work. Bid alternates are provided with a combination of open cut replacement and CIPP lining the existing sewer main. Zone 4 Sewer: Montana Avenue Area The Zone 4 project area includes the alley north of Montana Avenue between North 27th Street and North 20th Street. The work in Zone 4 includes the CIPP lining of 2,700 linear feet of the existing 15-inch and 18-inch clay sewer mains, a small portion of open cut replacement, service reconnections, manholes, lining existing manholes, and associated work. Zone 5 Sewer: 1st Avenue South Area The Zone 5 project area generally includes the area between 1st Avenue South and State Avenue and between South 41st Street and South 39th Street. The work in Zone 5 includes 3,070 linear feet of 8-inch sanitary sewer main replacement (primarily CIPP lining the existing sewer main with a small portion of open cut replacement), manholes, lining existing manhole, service reconnections, and associated work. Zone 6 Water: 13th Street West Area The Zone 6 project area includes 13th Street West between Yale Avenue and Princeton Avenue. The work in Zone 6 includes 345 linear feet of 8-inch water main replacement, gate valves, and associated work. Contractor's and any of the Contractor's subcontractors bidding or doing work on this project will be required to obtain registration with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. All laborers and mechanics employed by Contractors or subcontractors in performance of the construction work shall be paid wages at rates in accordance with the Montana Statewide Prevailing Wage Rates included in the Project Manual. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the "City of Billings, MT", in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. Bids submitted via email shall have the bid bond scanned and included with the bid. Bids submitted via mail or hand delivered shall have any of the bid securities included. No bid may be withdrawn after the scheduled time for the public opening of bids. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of the Owner. For further information concerning this project, please contact Jeff Heidner, PE, Project Manager for Morrison-Maierle, Inc. at (406) 237-1244 or jheidner@m-m.net; or Travis Harris, PE, Project Manager for the City of Billings at (406) 657-3021 or HarrisT@billingsmt.gov. The City of Billings is an Equal Opportunity Employer.
Bid Results
Water / Sewer
$3,314,566.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2023
April 24, 2023
Multiple Locations, Billings, MT
Related To This Project
Billings, MT
Bid Date: Feb 21 2023
Billings, MT
Bid Date: Feb 13 2023
Billings, MT
Bid Date: Mar 07 2023
Billings, MT
Bid Date: Mar 06 2023
Billings, MT
Bid Date: Mar 06 2023
Billings, MT
Bid Date: Mar 07 2023
Billings, MT
Bid Date: Mar 06 2023
Billings, MT
Bid Date: Mar 07 2023
Billings, MT
Bid Date: Feb 16 2023
Billings, MT
Bid Date: Feb 06 2023
Billings, MT
Bid Date: Mar 04 2024
Billings, MT
Bid Date: Feb 06 2023
Billings, MT
Bid Date: Mar 15 2023
Billings, MT
--
Billings, MT
Bid Date: Feb 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.