BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Cherry Valley Township, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Job No. C-92-091-22, I-39/US20 System Interchange, Phase III Project, Winnebago County, Region Two/District Two. This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on May 4, 2023, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services for the reconstruction of the I-39/US20 system interchange, including I-39 from approximately 0.78 miles north of Blackhawk Road to approximately 0.3 miles east of Mulford Road and US20 from approximately 0.6 miles west of Mulford Road to I-39. The project also consists of local road reconstruction of Linden Road at Ramp BD and Mulford Road at I-39/US20. Structural work for this project includes the installation of five (5) new bridges and MSE wall construction for the Ramp BD bridge over US20. This project is part of an overall multiple contract corridor with overall corridor coordination provided by a G.E.C. The anticipated construction completion date is December 31, 2024. The Consultant must complete and submit final measurements, calculations, electronic as-built survey data, as-built plans (PDF Form) and final contract records documents to the department no later than six (6) months after completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 27 - RFQ Engineering - I-39/US20 System Interchange, Phase III Project, Winnebago County, Region Two/District Two

Conceptual

Roads / Highways

$4,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
294
Bidding Soon
3,921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

Project location map

I-39 & US-20, Cherry Valley Township, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.