Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a transportation facility in Oklahoma City, Oklahoma. Conceptual plans call for the renovation of a transportation facility.
The purpose of this sources sought notice is to gain knowledge of potential sources for this project. Responses will be used to assist in the feasibility determination to Set-aside for Small Business and/or Small Businesses with socio-economic status. This notice is for market research and planning purposes only. No reimbursement will be made for any costs associated with providing information in response to this sources sought notice or any follow up information requests. All interested parties should respond. The US Marshals Service (USMS) JPATS intends to issue a solicitation and award of a contract to alter the JPATS Hangar located at Will Rogers World Airport, 5900 Air Cargo Road, OKlahoma City, OK. The magnitude of this project is between $1,000,000 and $5,000,000. All interested concerns should provide responses no later than 16 Februrary 2023. Responses shall not exceed five (5) typewritten pages and must include: (1) Capabilities Statement (2) positive statement of intent to offer/propose as a prime contractor (3) a completed and signed Source Sought Information Request Form (attached) (4) a listing of relevant projects of similar size and scope completed during the past five (5) years, both for government and private industry. The type of project, dollar value, contract number, location, and point of contact are to be included. Indicate if your firm was the prime or subcontractor, and if subcontractor, provide the name and point of contact for the prime contractor. (5) a brief outline of resources, subcontractors, and key personnel that would be used to perform the contract. In the event that adequate Small Business interest is not received to determine SET-ASIDE feasibility, the project may be advertised as UNRESTRICTED. All responses shall be provided via email to: sheila.nimrod@usdoj.gov. Include the following in the subject line-Sources Sought 15M30023SS3700031. No facsimile responses will be honored. Objective: The primary objective of this Project is to modify JPATS existing hangar structure and install a tail door in each hangar bay with sufficient vertical and horizontal clearance to fully enclose a Boeing 737-800 aircraft. Description of Work: The scope of the project includes but is not limited to furnishing all designs, permits, materials, labor, tools, transportation, equipment, testing services, quality control, incidentals, and warranty required to perform and accomplish the Project. All work will be performed in accordance with all applicable construction codes. The project includes two (2) primary tasks: Task 1: Design Services and Pre-Construction Services The contractor will be responsible to perform the following Design Services and Pre-Construction Services which include, but are not limited to: o Project design o Construction Drawings o As-Built Drawings o Obtaining All Applicable Permits to include Will Rogers World Airport and Oklahoma City Permits o Certification of Construction Bonds, Insurance / Certification of Liability o Construction Schedule o Detailed Project Work Plan / Rough Order of Magnitude o Organization of pre-construction meetings o All applicable Surveys Task 2: Deliverables and Construction Services The contractor shall be responsible for all work / service pertaining to completion of the project as agreed to in the construction drawings. The contractor shall also furnish supervision, all labor, materials, equipment, supplies, and insurance required to complete the following to include, but not limited to: o Detailed Project Work Plan describing the activities and steps necessary to complete the tasks outlined in this statement of work which must be approved by JPATS Program Office / Contracting Offices Representative (COR). The work plan shall include but not limited to: a. The project management approach b. Quality Control c. Roles and responsibilities and d. Project timeline laid out withing the ROM and align with the Magnitude of Construction. o Approval of all design documents required by Will Rogers World Airport and Oklahoma City o Demolition associated with the hangar modification o Installation of a tail door in each hangar bay with sufficient vertical and horizontal clearance o Relocation / installation of all applicable utilities o All manuals and / or drawings (mechanical and electrical) associated with tail door o Construction site clean up The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Transportation Terminals
$5,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2024
5900 Air Cargo Rd, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Mar 09 2022
Oklahoma City, OK
Bid Date: Mar 03 2022
Oklahoma City, OK
Bid Date: Dec 08 2023
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Feb 08 2023
Oklahoma City, OK
Bid Date: Mar 03 2023
Oklahoma City, OK
Bid Date: Aug 14 2024
Oklahoma City, OK
Bid Date: Mar 09 2023
Oklahoma City, OK
Bid Date: Feb 22 2023
Oklahoma City, OK
Bid Date: Feb 22 2023
Oklahoma City, OK
Bid Date: Feb 22 2023
Oklahoma City, OK
Bid Date: Mar 01 2023
Oklahoma City, OK
Bid Date: Feb 07 2023
Oklahoma City, OK
Bid Date: Feb 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.