BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Grover Beach, California. Working plans call for site work for a water / sewer project.

***As of February 5, 2024. Bid is cancelled. rebid date not availabel at this time. In general, the Base Bid Work involves construction of 2,465 feet of 10-inch diameter sewer pipe, 1,450 feet of 12-inch diameter sewer pipe, and 301 feet of 18-inch diameter sewer pipe. Approximately 3,423 feet of pipe will be installed using pipe bursting methods. Work will also include installation of five new manholes, installation of one cleanout, and the coating of four manholes. The estimated opinion of probable construction cost for this Base Bid Work is approximately $3,200,000. Each bid shall be accompanied by cash, certified or cashier's check, or bidder's bond for not less than ten percent (10%) of the amount of the base bid, made payable to the City of Grover Beach. This Work shall be diligently prosecuted to completion before the expiration of ONE HUNDRED AND TEN (110) WORKING DAYS beginning on the 30 th calendar day after approval of the Contract. The City will issue a Notice to Proceed that reflects this duration for Contract time. The Contractor shall pay to the City of Grover Beach liquidated damages in the sum of ONE THOUSAND DOLLARS ($1,000.00) per day, for each and every calendar days delay completing the work of improvements in excess of the number of working days prescribed above through the Contract acceptance date. The right is reserved by the City of Grover Beach to reject any or all bids, to evaluate the bids submitted, and award the Contract to the lowest responsible bidder. The City further reserves the right to waive any informalities or minor irregularities in the bid.

Final Planning

Water / Sewer

$3,200,000.00

Public - City

Site Work

26

17

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
40
Bidding Soon
505
All Active Projects
239
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2024

April 8, 2024

August 27, 2024

img_map_placeholder

To Be Determined, Grover Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.