BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a fire / police facility in Santa Ana, California. Completed plans call for the renovation of a fire / police facility.

The City is soliciting competitive bids from qualified contractors to furnish all labor, supervision, equipment and materials for services related to flooring replacement at the Orange County Fire Authority Station No. 74 located at 1427 S. Broadway, Santa Ana, CA 92707. Contractor shall complete work specified herein within thirty (30) working days after the commencement date stated in the Notice to Proceed. Bidders shall submit Bid Bond or Certified Check in a sealed envelope Bid Bond or Certified Check must be received no later than 3 business days after the bid due date. 1. Removing existing carpet and wall base. 2. Preparation of substrate and walls for new flooring and wall base. 3. Furnishing and installation of new Luxury Vinyl Tiles (LVT), carpet, and wall base. 4. Grinding sections of floor as needed to level a clear path of travel. 5. Contractor shall relocate any existing furniture to perform the work specified herein and also replace said furniture after completion of work. Items may be lifted in-place and/or moved to another area on the same floor. 6. Contractor must procure the exact flooring material as specified by the City (EXHIBIT II). 7. Contractor shall be responsible for daily clean-up and to protect electronic devices from dust. 8. During and at completion of work, debris shall not be allowed to spread unnecessarily into adjacent areas nor accumulate in the work area. All debris, excess material, and parts, including those materials that could inflict injury (e.g., nails, wire, wood, etc.), shall be cleaned up continuously as work progresses and removed at the completion of the job and/or at the end of each work day. 9. Contractor shall arrive at the project site as scheduled and all work shall be performed in a skillful and workmanlike manner by Contractor personnel that is trained and licensed appropriately for the work performed.\ 1 Remove existing carpet, tile and wall base, prepare substrate and walls 2 Furnish and install new LVT 3 Furnish and install new carpet 4 Furnish and install new wall base 5 Premium Self-Leveling Underlayment 6 Floor Grinding

Bid Results

Fire / Police

$58,673.00

Public - City

Renovation

3

10

9

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
111
Bidding Soon
2,414
All Active Projects
1,077
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

April 5, 2023

img_map_placeholder

1427 S Broadway, Santa Ana, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.