BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Berkeley, Missouri. Completed plans call for the renovation of a educational facility.

The Ferguson-Florissant School District is requesting owner supplied Trane-Mitsubishi VRF heat pumps installed in 13 kitchens and store rooms throughout the district. Contractor will be required to install the VRF heat pumps per all state, county and local code. The contractor will be required to provide all necessary materials and equipment needed for this installation. This will include but is not limited to condensate pumps, refrigerant line sets, outdoor equipment pads or rails and wiring. Contractor is required to start up all equipment and check for proper operations. Line sets need to be installed above drop ceiling were applicable. If line sets cannot be installed above drop ceiling, line hide will need to be installed around line sets. Locations of condensers and evaporators will be determined at the walk through. Location of Kitchens : Berkeley Elementary 8300 Frost Ave. Berkeley, MO 63134. Commons Lane Elementary 2700 Derhake Road Florissant, MO 63033. Combs Elementary 300 St. Jean St. Florissant, MO 63031. Cool Valley School 1351 South Florissant Rd. Cool Valley, MO 63121. Duchesne Elementary 100 South New Florissant Rd. Florissant, MO 63031. Griffith Elementary 200 Day Dr. Ferguson, MO 63135. Halls Ferry Elementary 13585 New Halls Ferry Rd. Florissant, MO 63033. Holman Elementary 8811 Harold Dr. Berkeley, MO 63134 Parker Road Elementary 2800 Parker Rd. Florissant, MO 63033. Restoration Center 1555 Derhake Rd. Florissant, MO 63033. Robinwood Elementary 955 Derhake Rd. Florissant, MO 63033. Walnut Grove Elementary 1248 New Florissant Rd. Calverton Park, MO 63135. Wedgwood 6th Grade Center 14275 New Halls Ferry Rd. Florissant, MO 63033. If the proposal exceeds $10,000, the contractor shall submit with the proposal a cashier's check, certified check or acceptable bidder's bond payable to the school district in an amount not less than 5% of the amount of the bid submitted, as a guarantee that if awarded the contract the bidder shall promptly enter into a contract and execute such bonds as required. The owner shall require the successful bidder to furnish a Performance Bond and Labor and Materials Payment Bond prior to the execution of the contract. The bonds shall be written in the amount of 100% of the total contract price. The contractor shall comply with the statutory policy of the State of Missouri stating, "Not less than the prevailing hourly rate of wages shall be paid to all workers performing work under this contract." The contractor will forfeit a penalty to the contracting public body ten dollars a day or portion thereof if a worker is paid less than the prevailing rate for any work done under the contract by the contractor or by any subcontractor under them. Section 290.250 RSMo.

Post-Bid

Educational

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
38
Bidding Soon
815
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2023

March 30, 2023

img_map_placeholder

Multiple Locations, Berkeley, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.