BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Fort Defiance, Arizona. Completed plans call for site work for a road / highway.

**As of March 30, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Navajo Tribal Utility Authority (NTUA) is a non-profit, multi-utility enterprise of the Navajo Nation which provides electric, water, wastewater, natural gas, photovoltaic, and telecommunication services covering approximately 27,000 square miles across northeastern Arizona, northwestern New Mexico and Utah. NTUA has seven main district offices located in strategic communities spanning the Navajo Reservation, with its corporate headquarters located in Fort Defiance, Arizona. Questions Due: February 10, 2023 All questions must be submitted in writing to Avis Jimm, Contract Administrator via email at avisj@ntua.com. Proposer(s) will risk jeopardizing their eligibility if any person other than the Contract Administrator is contacted for clarification. Any interaction with NTUA staff or on-site contractor by the Proposer will constitute disqualification. NTUA currently is operating over 570 miles of fiber optic network and desires to install spurs from existing backbone network to customers; therefore, the selected proposer shall provide a construction team who will perform a defined scope of work and to include key components and functionality, but not limited to. To install fiber optic cable via the following construction method (aerial, in conduit, underground); consisting of loose tube or ADSS for 96 count and 24 count fiber on distribution power line and/or transmission line. Installation work for lower count fiber such as 6 count or 12 count (aerial, in conduit, underground or into the buildings demarcation) will be installed by NTUA. The accomplishment of the work shall be done in accordance with the construction drawings and these specifications. Any procedure shall provide for the safe conduct of the work, coordination with any other work in progress and coordination with NTUA. NTUA shall provide the selected proposer all materials required for and incidental to installing all fiber optic cable onto the existing distribution line. Work includes constructing, installing,splicing, activating, and testing the proposed fiber optic cable. The successful contractor shall install all the necessary storage loops with splice boxes as specified or wherever necessary and will be responsible for the testing and splicing. Selected proposer is responsible for providing their own equipment/tools/vehicles to perform SOW. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Roads / Highways

$200,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
2
Bidding Soon
109
All Active Projects
34
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 21, 2023

March 23, 2023

img_map_placeholder

Multiple Locations, Fort Defiance, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.