Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 24, 2023 at 8:00 PM
Updated October 1, 2024
Site work and paving for a bridge / tunnel in Hanna City, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The project includes bridge deck overlay and scour mitigation to SN 072-0162 carrying IL 8 over Walnut Creek, East of IL 78. The project improvement length is 0.058 miles. Region 3 District 4 Federal Project #HBFPSH8T(617) County(s) Peoria Key Route(s)FAS 1388 Marked Route(s)IL 8 Section(s) [(Z-4B-15D)BR]BDR,SCR State Job #(s) C-94-061-21, D-94-042-21 PPS #(s)4-07221-0500 Completion Date: 35 Working Days Questions not accepted as of February 28, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 17, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 042 - Bridge Deck Overlay and Scour Mitigation to SN 072-0162 Carrying IL 8 This project is located at Illinois Route 8 over Walnut Creek, just east of Illinois Route 78, in Peoria County. DESCRIPTION OF PROJECT The work on this project includes bridge deck and approach pavement scarification and microsilica overlay, inlet adjustments, riprap swales, minor scour mitigation work, replacement of existing guardrail, and all related collateral work necessary to complete the project. The Contractor shall complete the work within 35 working days.
Award
Bridges / Tunnels
$523,800.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 09 - Finishes
Division 14 - Conveying Equipment
Division 23 - Heating Ventilating and Air Conditioning
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2023
April 10, 2023
IL 8, Hanna City, IL
Related To This Project
Hanna City, IL
Bid Date: Apr 28 2023
Hanna City, IL
Bid Date: Mar 30 2023
Repairing Various Widths of Pavement Marking Including Lines, Letters, Numbers and Symbols - 5025258
Hanna City, IL
Bid Date: Apr 28 2023
Hanna City, IL
Bid Date: Apr 14 2023
Hanna City, IL
Bid Date: Jun 16 2023
Hanna City, IL
Bid Date: Jun 16 2023
Hanna City, IL
Bid Date: Sep 22 2023
Hanna City, IL
Bid Date: Jan 21 2022
Hanna City, IL
Bid Date: Mar 10 2023
Hanna City, IL
--
Hanna City, IL
Bid Date: Jul 21 2022
Hanna City, IL
Bid Date: Apr 14 2022
Hanna City, IL
Bid Date: Apr 28 2022
Hanna City, IL
Bid Date: Apr 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Bridge Deck Overlay and Scour Mitigation to SN 072-0162 Carrying IL 8
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.