Published March 8, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Elizabethtown, Kentucky. Completed plans call for the renovation of a 45,820-square-foot educational facility.

For Elizabethtown Community and Technical College (ECTC) On-Site Training Center - Phase 2 The KCTCS-ECTC Construct Onsite Training Center - Phase 2 project will be bid and constructed utilizing the Construction Management as Constructor form of construction contract delivery. Trace Creek Construction will be the Construction Manager for the project under direct contract with DECA. The project is generally described as approximately 45,820 sq. ft. single story facility, with a mechanical mezzanine. The project is inclusive of a new training facility for KCTCS-ECTC in Glendale, KY, in partnership with the new Ford Manufacturing facility currently being constructed on the same campus. The project is to be completed in 350 calendar days. The bids shall be guaranteed for a period of thirty days and no bid may be withdrawn prior to the thirty-day period. The below bonding requirements shall apply to Bid Package 006 General Trades (Phase 2), Bid Package 007 Roofing, Bid Package 008 Aluminum Storefronts, Curtain Walls, & Glazing, Bid Package 009 Gypsum Systems & Ceilings, Bid Package 010 MCM / Formed Metal Wall Panels, Bid Package 011 Tiling & Resilient Flooring, Bid Package 012 Painting & Special Coatings, Bid Package 013 Fire Suppression, Bid Package 014 Mechanical, and Bid Package 015 Electrical. A 5% bid bond or certified check equal to 5% of the bid including all alternates is required to be submitted with the official form of proposal. A 100% payment and performance bond shall be executed for the full contract value of the base bid and any alternates accepted. Bids will be received from Individual Trade Package Contractors on a Lump Sum Bid Basis for the Individual Trade Bid Package as described herein. All phases of the work described and outlined within the Individual Trade Bid Packages will be completed by the successful Individual Trade Bid Package Contractor. Bids shall be submitted in the manner herein described and on the official proposal form included with the general conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum bid shall not be cause for withdrawal of bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. Trace Creek reserves the right to accept and/or reject any bid deemed to be in the best interest of the Owner. Bid Results Bid Package 06: General Trades (Phase 2) Rising Sun Developing - $3,505,000.00 Bid Package 07: Roofing Kalkruth Roofing - $879,800.00 Bid Package 08: Aluminum Storefronts, Curtain Walls, & Glazing Central KY Glass - $725,890.00 Bid Package 09: Gypsum Systems & Ceilings Bennetts Contracting - $1,610,000.00 Bid Package 10: MCM / Formed Metal Wall Panels Merrick-Kemper - $1,544,000.00 Bid Package 11: Tiling & Resilient Flooring CDI Flooring -$137,006.00 Bid Package 12: Painting & Special Coatings McKinney Painting - $148,750.00 Bid Package 13: Fire Suppression Landmark Sprinkler - $314,750.00 Bid Package 14: Mechanical Cochran Mechanical - $2,998,907.27 Bid Package 15: Electrical Arrow Electric Co. - $4,607,800.00

Bid Results

Educational

$16,471,903.00

Public - State/Provincial

Renovation

137

27

5

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Fluid-Applied Flooring, Resinous Flooring, Wall Finishes, Stone Facing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Exterior Specialties, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Computers, Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Furniture, Seating, Chairs, Upholstered Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Public Address and Mass Notification Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting, Plants, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Communications Utilities, Communications Structures
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Gas Process Equipment, Process Gas Pressure Regulators

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
34
Bidding Soon
686
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

May 1, 2023

img_map_placeholder

600 College Street Rd, Elizabethtown, KY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

KCTCS-ECTC Construct Onsite Training Center Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.