Published March 4, 2023 at 7:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a bridge / tunnel in Montgomery, Alabama. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

The scope of work Electrical RGB bridge lighting enhancement to Union Street, Decatur Street, Jackson Street bridges. Questions concerning the project can be directed to: Morgan Garner, PE, Principal, Garner & Associates Engineering PC, at morgan@garner-engineering.com. The City of Montgomery is required to comply with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, 31-13-1 et seq. of Code of Alabama 1975 (Act No. 2011-535), subsequently all bidders are required to submit an E-Verify Affidavit stating they are enrolled in the E-Verify Program and the entire associated Memorandum of Understanding on the outside of their sealed bid proposals. The City of Montgomery adopted Resolution 63-2021, an administrative plan for a 30% minimum participation goal for disadvantaged, minority and women owned business enterprises for public works projects. This resolution is included in the bid documents for contractors to review and acknowledge review by signing Exhibit A. The successful bidder is required to carry Workmen's Compensation Insurance and Public Liability Insurance, and if a subcontractor is employed, Contractor's Contingent Liability Insurance. Bidders are required to file with bid a certified check or bid bond through a surety company authorized to do business in the State of Alabama; either form made payable to the City for an amount not less than 5% of the City's estimated cost or of the contractor's bid, but in no event more than $50,000.00. Bidders are hereby notified that all provisions of Section 80, Act No. 571 Regular Session of June 19, 1959, approved November 19, 1959, entitled "An Act to Regulate the Licensing of General Contractors" shall be strictly observed. Also, it is necessary for persons submitting bids for work involving $50,000.00 or more to show satisfactory evidence of license as a general contractor. A bond in a reliable surety company authorized to do business in the State of Alabama must be given by the successful bidder, such bond to be for the sum of 100% of the contract price conditioned for the prompt and faithful performance of contract terms and a surety bond in the amount equal to 50% of the contract prices as security for the payment for all persons performing labor and furnishing materials in connection with the contract. The City reserves the right to accept or reject any and all bids and waive technicalities. Contract shall not be binding upon either party or considered closed until approved by the Mayor of the City of Montgomery. Questions deadline: 2/21/23 at 4:00 PM

Bid Results

Bridges / Tunnels

$430,023.00

Public - City

Outdoor Lighting, Site Work

19

9

4

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
33
Bidding Soon
507
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2023

March 27, 2023

img_map_placeholder

Multiple Locations, Montgomery, AL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Montgomery Rgb Bridge Lighting

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.