Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Towanda, Illinois. Completed plans call for site work for a bridge / tunnel.
Culvert replacement on US 51B over ditch 0.1 mile North of RAAB Rd, in Normal, Region 3 District 5 Federal Project #NHPPEF64(538) County(s)McLean Key Route(s) FAP 730 Marked Route(s) US 51B Section(s) 57-4(1)CR State Job #(s) C-95-056-20 PPS #(s)5-52947-0000 Completion Date: 40 Working Days Questions not accepted as of February 28, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 17, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 43 - Culvert Replacement on US 51B The intent of this project is to replace the culvert S.N. 057-8194 over ditch located 0.1 mile north of Raab Road in Normal with proposed S.N. 057-8236 carrying FAP 730 (US 51B). This work should be completed utilizing stage construction on FAP 730 (US 51B). Appropriate traffic control with the applicable Highway Standards for any remaining incidental work, until construction is complete. The Contractor shall utilize methods necessary to protect and preserve the surrounding environment and properties during construction of this project. This project involves but is not necessarily limited to the following items of work: 1. Replacement of S.N. 057-8194 with proposed S.N. 057-8236 utilizing stage construction 2. Placement of Class B patch and Soil Retention System 3. Placement of Combination Curb and Gutter Type B-6.24 4. Placement of Inlets, Type B, Type 24 Frame and Grate 5. Placement of Revetment Mat and Paved Flume 6. Seeding, mulch, and final clean-up 7. All other necessary items to complete construction on FAP 730 (US 51B) The Contractor shall complete the work within 40 working days. DBE (2%)
Award
Bridges / Tunnels
$552,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2023
April 10, 2023
US 51B, Towanda, IL
Related To This Project
Towanda, IL
Bid Date: May 25 2023
Towanda, IL
Bid Date: May 25 2023
Towanda, IL
Bid Date: Jun 16 2023
Towanda, IL
Bid Date: Feb 15 2022
Towanda, IL
Bid Date: Feb 15 2022
Towanda, IL
Bid Date: Jan 21 2022
Towanda, IL
Bid Date: Mar 11 2022
Towanda, IL
Bid Date: Mar 11 2022
Towanda, IL
Bid Date: Jun 28 2022
Towanda, IL
Bid Date: Jun 17 2022
Towanda, IL
Bid Date: Jun 01 2022
Towanda, IL
Bid Date: May 26 2022
Towanda, IL
Bid Date: Apr 29 2022
Towanda, IL
Bid Date: Dec 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.