BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Ann Arbor, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

0.39 mi of installation of high friction surface treatment on US-23 and M-14 Trilevel interchange ramps, Washtenaw County. This project includes a 5 year thin epoxy performance warranty. ITEM NUMBER 2303 043 Control Sec Job No Federal No HSIP 81103 211818A 23A0282 Net classification required for this project is 518 N7 MI DOT - 2303 043 - Installation of High Friction Surface Treatment on US-23 and M-14 Trilevel Interchange Ramps Submit a Progress Schedule. The Engineer for this project is as follows: James R. Daavettila, P.E. MDOT Brighton TSC 10321 E. Grand River, STE. 500 Brighton, MI 48116 (810) 227-7929 DaavettilaJ@michigan.gov

Award

Roads / Highways

$402,856.00

Public - State/Provincial

Paving, Site Work

5

6

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
201
Bidding Soon
2,510
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2023

May 2, 2023

Project location map

M-14 & US-23, Ann Arbor, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.