BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 16, 2023 at 8:00 PM

Updated February 13, 2024

Site work and paving for a mixed-use development in Duluth, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Mill Bituminous Surface, ADA Pedestrian Improvements, Concrete Curb Gutter, Concrete Sidewalk, Plant Mixed Bituminous Surface, and Bridge No. 69L09 (County Bridge 6) and Approaches Expected Award Date:03/14/2023 Project Start Date:07/10/2023 Construction Start Date:07/10/2023 Construction End Date:09/02/2023 Construction Location:CSAH 4 (Rice Lake Road) from a Point Approx. 429' N of TH 194 (Central Entrance) to a Point Approx. 107' S of MSAS 160 (Arrowhead Road)

Award

Bridges / Tunnels

$2,126,700.00

Public - County

Paving, Site Work

75

10

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

July 10, 2023

Project location map

Multiple Locations, Duluth, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.