Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, asbestos abatement and renovation of a residential development in Lumberton, North Carolina. Working plans call for the renovation of a residential development; for site work for a residential development; and for asbestos abatement for a residential development.
As of March 16, 2023, there were no bids received. No definite date for the rebid. For Complete Gut and Rehab with Asbestos Removal , Water Damaged Unit Abatement and Restoration at 309 Spruce Street, Lumberton, NC 28358. HACL is seeking bids from qualified and experienced firms who have a successful history in dwelling rehabilitation where water damages were involved. The subject unit had water damage from the second-floor bathroom leak. Due to the asbestos containing floor mastic the unit will need to be mitigated by a qualified Environmental Company. The purpose of this IFB is to procure services to restore the unit. The selected Contractor must provide all necessary permits, transportation, supervision, labor, licenses, tools, equipment, services and expertise to perform contractual services. Q/A Cutoff Date: 02/22/202315 Q/A Cutoff Time: 02:00 PM EST Approximate Delivery Date / Start Date: 06/07/2023 Completion- 120 calendar days Bidders must submit one (1) copy of the bid submittal, including extending tabs, in a sealed package, properly addressed. So that the Agency can properly evaluate the offers received, all such hard-copy bid submittals must be formatted in accordance with the sequence noted below. Each category must be separated by index dividers numbered (which number extends so that each tab can be located without opening the bid). None of the proposed services may conflict with any requirement the Agency has published herein or will issue by addendum. "Asbestos Abatement" - This project includes the removal of two layers of VCT tile (951 square foot each layer), second layer's mastic contains asbestos and 450 square feet of subfloor. Second Floor in adjoining unit had an additional layer of 450 square foot of asbestos containing VCT tile and an additional layer of 450 square feet of subfloor. LIVINGROOM Demo and replace; 3 1/4 " baseboards solid pine with factory prime 41.67 LF Base shoe molding solid pine with factory prime 41.67 LF Sheetrock walls and ceiling / 5/8" drywall: hung, taped, floated, ready for paint 471.81 SF 2 1/4 " casing solid pine with factory prime 34.00 LF Exterior wall Batt Insulation / 6" R19 paper/foil faced 309.24 SF Vinyl tile / Armstrong VCT Tile Flooring 162.57 SF Seal/Prime then paint the walls and ceiling (two coats) 471.81 SF Seal and paint baseboards with shoe molding (two coats) 41.67 LF Seal and Paint casing (two coats) 34.00 LF Detach and Interior Doors 1.00EA Detach and reset light fixtures 1.00EA Paint door and window opening (two coats All sides) 2.00EA DINING ROOM Demo and replace; Replace Batt insulation - 6" - R19 - paper / foil faced (exterior walls) 245.22SF Replace 5/8" drywall - hung, taped, floated, ready for paint 335.22SF Seal/prime then paint the walls and ceiling (two coats) 335.22SF Detach & Reset Interior door 1.00EA Replace Vinyl tile - Armstrong VCT Tile Flooring 90.00SF Baseboard - 3 1/4" solid pine with factory prime 31.58LF Base shoe molding / solid pine with factory prime 31.58LF Seal & paint baseboard w/shoe - two coats 31.58LF Casing - 2 1/4" solid pine with factory prime 34.00LF Paint casing (two coats) 34.00LF KITCHEN Demo and replace; Seal/prime then paint the walls and ceiling (2 coats) 293.92SF Vinyl tile / Armstrong VCT Tile Flooring 79.47SF Detach and Reset range hood (HACL will provide new replacement) 1.00EA Baseboard - 3 1/4" solid pine with factory prime 24.67LF Base shoe solid pine with factory prime 24.67LF Seal & paint baseboard w/shoe - two coats 24.67LF Casing - 2 1/4" solid pine with factory prime 34.00LF Paint casing - two coats 34.00 LF Paint door or window opening - two coats (per side) 2.00 EA Batt insulation - 6" - R19 - paper / foil faced (exterior walls) 214.44 SF 5/8" mold and moisture resistant drywall - hung, taped, floated, ready for paint 293.92 SF Detach & Reset Light fixture 1.00 EA Replace Cabinetry - lower (base) units 12.00 LF Replace Cabinetry - upper (wall) units 13.00 LF Replace Countertop - flat laid plastic laminate 14.00 LF Detach & Reset Sink faucet - Kitchen 1.00 EA Replace P-trap assembly - PVC 1.0 LAUNDRY ROOM (opens to kitchen) Demo and replace; 5/8" drywall - hung, taped, floated, ready for paint 139.63SF Seal/prime then paint the walls and ceiling (two coats) 139.63SF Replace Vinyl tile - Standard grade 16.96SF Baseboard - 3 1/4" solid pine with factory prime 14.83LF Base shoe solid pine with factory prime 14.83LF Seal & paint baseboard &shoe - two coats 14.83LF Replace Casing - 2 1/4" solid pine with factory prime 34.00LF Paint casing - two coats 34.00LF Paint door or window opening - two coats (per side) 2.00EA Replace Batt insulation - 6" - R19 - paper / foil faced (exterior walls) 122.67SF Replace Shelving - Pine 22.25LF Seal & paint closet shelving - Pantry 22.25LF Detach & Reset Water heater - 30 gallon - Electric - 9yr 1.00EA HVAC CLOSET Replace Furnace - heavy clean, replace filters and service - w/ AC 1.00EA Replace Ductwork - hot or cold air Lower Floor (Ceiling) 35.00LF Replace Heat/AC register - Mechanically attached Lower Floor 4.00EA COAT CLOSET / STORAGE (Under stairs) Demo and replace; Replace 5/8" drywall - hung, taped, floated, ready for paint 132.42 SF Seal/prime then paint the walls and ceiling (2 coats) 132.43 SF Detach & Reset Interior door - slab only 1.00 EA Replace Vinyl tile - Armstrong VCT Tile Flooring 12.42 SF Replace Baseboard - 3 1/4" solid pine with factory prime 14.26 LF Replace Base shoe solid pine with factory prime 14.26 LF Seal & paint baseboard & shoe - two coats 14.26 LF Replace Casing - 2 1/4" solid pine with factory prime 38.00 LF Paint casing - two coats 38.00 LF Paint door - 2 coats (per side, including all four ends) 1.00 EA Replace Batt insulation - 6" - R19 - paper / foil faced (exterior walls) 140.71 SF HALLWAY (1 st Floor) Demo and replace; Replace 5/8" drywall - hung, taped, floated, ready for paint 110.82 SF Seal/prime then paint the walls and ceiling (2 coats) 110.82 SF Detach & Reset Interior door - Colonist - slab only 1.00 EA Replace Vinyl tile - Armstrong VCT Tile Flooring 26.13 SF Replace Baseboard - 3 1/4" solid pine with factory prime 9.42 LF Replace Base shoe solid pine with factory prime 9.42 LF Seal & paint baseboard & shoe - two coats 9.42 LF Replace Casing - 2 1/4" solid pine with factory prime 34.00 LF Paint casing - two coats 34.00 LF Paint door or window opening - 2 coats (per side) 2.00 EA Replace Batt insulation - 6" - R19 - paper / foil faced (exterior walls) 84.69 SF Detach & Reset Light fixture 1.00 EA
Final Planning
Residential Subdivision
$200,000.00
Public - City
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2023
September 15, 2023
309 Spruce St, Lumberton, NC
Related To This Project
Lumberton, NC
Bid Date: Mar 07 2023
Lumberton, NC
Bid Date: Mar 07 2023
Lumberton, NC
Bid Date: Mar 29 2023
Lumberton, NC
Bid Date: Oct 14 2020
Lumberton, NC
Bid Date: Apr 12 2023
Lumberton, NC
Bid Date: May 10 2023
Lumberton, NC
Bid Date: May 08 2023
Lumberton, NC
Bid Date: May 18 2023
Lumberton, NC
Bid Date: Feb 21 2023
Lumberton, NC
--
Lumberton, NC
Bid Date: Feb 23 2023
Lumberton, NC
Bid Date: Feb 21 2023
Lumberton, NC
Bid Date: Jan 18 2023
Lumberton, NC
Bid Date: Sep 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.