Site work, paving and new construction of a mixed-use development in Webster Groves, Missouri. Completed plans call for the construction of a recreation facility; swimming pool; for site work for a swimming pool; and for paving for a swimming pool.

As of May 19, 2025 construction is in its final stage. ______________________________________________________________________ The Aquatic Center will be constructed on approximately 19 +/- acres of city property located at 33 E. Glendale Avenue, Webster Groves, Missouri, 63119. The following information is an understanding of the project identification and scope. a. Type & Size: Construction of a Class B Swimming Pool meeting 2021 International Swimming Pool and Spa Code and the Americans with Disabilities Act with three separate bodies of water, including maximum amount of water surface and all related fencing, gates, ladders, rails, concrete deck, parking lot, pump house, bath house, beach entry, spray features, pumps, piping, valves, filters, drains, grates, chemical feed systems, shade structures, play structures, spray grounds (hereinafter referred to as Aquatic Center). b. Desired Features and Operational Aspects: The Aquatic Center is estimated to be operational from mid-May to beginning of September of each year so it must be designed and built for easy and efficient start-up and shut-down each season including draining of the pool and any plumbing which might be damaged from freezing. The pumps and controls must be at a location and elevation to prevent damage from flooding from Aquatic Center piping and storm water. The Aquatic Center shall be designed and built to minimize the required number of lifeguards and operational staff. The pool shall have a structural design and construction that allows it to be drained each year without risk of damage from outside lateral loads and buoyancy loads. The building(s) and piping systems should have a way to drain all piping so the building can be shut down and not heated when not in use. A performance bond on the part of the contractor for 100% (one hundred percent) of the contract price. A performance bond is one executed in connection with a contract to secure fulfillment of all the contractor’s obligations under such contract. A payment bond on the part of the contractor for 100% (one-hundred percent) of the contract price. A payment bond is one executed in connection with a contract to assure payment as required by law of all persons supplying labor and material in the execution of the work provided for in the contract. Schedule: Substantial Completion of the Project is to be achieved by April 1, 2026. The City intends to open and operate the new pool for the 2026 season. City reserves the right to reject or disregard any Statement of Qualifications, in whole or in part, based on City’s sole discretion. The evaluation and selection process entail the exercise of judgment and subjective analysis and decision-making. By submitting a Statement of Qualifications, Proposer waives any right to protest or object to the evaluation or selection process; City’s administration or conduct of the process; or any final decisions or selections made by City. September 8, 2023,1-2 p.m. Pre-submittal Q&A/walk through

Under Construction

Amusement and Recreation

$13,000,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
91
Bidding Soon
1,203
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2023

August 30, 2024

Project location map

33 E Glendale Rd, Webster Groves, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.