BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in High Point, North Carolina. Completed plans call for the renovation of a educational facility.

Prior to bidding, Contractors must perform a field verification of existing conditions, control systems, equipment, and any other building components and systems that will be affected by the HVAC Unit Replacement Project. 4020 Meeting Way, High Point, NC - Base Bid: replace ACU 4, 5, 6, and 7 Alternate #1: Replace ACU 2 and 3 Alternate #2: Replace ACU 1 and 8 Alternate #3: Replace new boiler Alternate #4: Replace ductwork for ACU 2 Alternate #5: Replace ductwork for ACU 1 Alternate #6: Replace ductwork for ACU 3 Alternate #7: Replace ductwork for ACU 4 Alternate #8: Replace ductwork for ACU 8 Alternate #9: Replace ductwork for ACU 6 Alternate #10: Replace ductwork for ACU 5 Alternate #11: Replace ductwork for ACU 7 4191 Mendenhall Oaks Parkway, High Point, NC - Base Bid: Replace ACU 4, 5, 6, 7, and 15 Alternate #1: Replace ACU 10 and 11 Alternate #2: Replace ACU 3 and 8 Alternate #3: Replace ACU 9 and 14 Alternate #4: Replace ACU 16 and 17 Alternate #5: Replace ACU 2 and 18 Alternate #6: Replace ACU 12 and 13 Locations: 4020 Meeting Way, High Point, Nc 27265 4191 Mendenhall Oaks Parkway, High Point, Nc 27265 Direct technical questions to: joel palma, pe palma engineers joel@palma-engineers all questions must be submitted by 4:00pm on monday, feb 13, 2023 If bidding, contact frank bylsma(fbylsma@nhaschools.Com) by 4:00pm on feb 15, 2023 for a link to submit your bid. 11. Performance Bond: A payment bond of 100% of the contract price will be required from the successful bidder. The performance bond is to assure fulfillment of all of the contractor's obligations under the contract. 12. Payment Bond: A payment bond of 100% of the contract price will be required from the successful bidder. The payment bond is to assure that payments to all companies and employees supplying labor and materials in the execution of contractor's obligations under this contract have been made Davis-Bacon Act: Contractor must meet the requirements of the Davis-Bacon Act

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Renovation

25

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
66
Bidding Soon
1,612
All Active Projects
675
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2023

May 29, 2023

img_map_placeholder

Multiple Locations, High Point, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.